02.05.2013 Views

for sustained success - Mondi

for sustained success - Mondi

for sustained success - Mondi

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Targets<br />

Cooperation<br />

with institutes<br />

(boosting public<br />

awareness)<br />

Location Measures Specifications Date<br />

NEUSIEDLER h Cooperation with Leoben University of Mining and – 2004<br />

AG Metallurgy, Austria: commissioning of a degree<br />

dissertation on a practical method <strong>for</strong> evaluating<br />

the eco-efficiency of production locations/products<br />

NEUSIEDLER h Cooperation with Leoben University of Mining and – 2004<br />

Ybbstal Metallurgy, Austria: commissioning of a degree<br />

dissertation on the exact balance and use of<br />

water at the Kematen mill<br />

NEUSIEDLER h Cooperation with a college at Ruz˘omberok <strong>for</strong> – 2004<br />

Ruz˘omberok monitoring the COD load of the river Vah<br />

h Cooperation with the Forestry Research<br />

Institute at Zvolen <strong>for</strong> monitoring SO2 emission effects on coniferous trees<br />

h Cooperation with the Technical University<br />

Bratislava <strong>for</strong> a possible reduction of the<br />

used-water turbidity<br />

h Cooperation with the J. A. Kemensks<br />

University at Bratislava <strong>for</strong> the hydrobiological<br />

examination of the river Vah<br />

h Cooperation with the National Health Institute<br />

<strong>for</strong> monitoring of emissions into air<br />

and their impact on people<br />

NEUSIEDLER h Examination of the influence of pulp-production – 2004<br />

Syktyvkar emissions on the sediments in the river Vychegda<br />

h Local monitoring of neighbouring <strong>for</strong>ests as to<br />

effects of immissions coming from the mill<br />

h Monitoring of soils and precipitation (snow)<br />

possibly affected by emissions from the mill<br />

All projects of the 2003 environmental programme were pushed ahead and<br />

realised in accordance with projected requirements and schedules. Only the<br />

conversion of the long fibre pulp bleaching at Syktyvkar to 100% ECF planned<br />

<strong>for</strong> 2004/2005 will be delayed on account of the extended scope of the project.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!