for sustained success - Mondi
for sustained success - Mondi
for sustained success - Mondi
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Targets<br />
Cooperation<br />
with institutes<br />
(boosting public<br />
awareness)<br />
Location Measures Specifications Date<br />
NEUSIEDLER h Cooperation with Leoben University of Mining and – 2004<br />
AG Metallurgy, Austria: commissioning of a degree<br />
dissertation on a practical method <strong>for</strong> evaluating<br />
the eco-efficiency of production locations/products<br />
NEUSIEDLER h Cooperation with Leoben University of Mining and – 2004<br />
Ybbstal Metallurgy, Austria: commissioning of a degree<br />
dissertation on the exact balance and use of<br />
water at the Kematen mill<br />
NEUSIEDLER h Cooperation with a college at Ruz˘omberok <strong>for</strong> – 2004<br />
Ruz˘omberok monitoring the COD load of the river Vah<br />
h Cooperation with the Forestry Research<br />
Institute at Zvolen <strong>for</strong> monitoring SO2 emission effects on coniferous trees<br />
h Cooperation with the Technical University<br />
Bratislava <strong>for</strong> a possible reduction of the<br />
used-water turbidity<br />
h Cooperation with the J. A. Kemensks<br />
University at Bratislava <strong>for</strong> the hydrobiological<br />
examination of the river Vah<br />
h Cooperation with the National Health Institute<br />
<strong>for</strong> monitoring of emissions into air<br />
and their impact on people<br />
NEUSIEDLER h Examination of the influence of pulp-production – 2004<br />
Syktyvkar emissions on the sediments in the river Vychegda<br />
h Local monitoring of neighbouring <strong>for</strong>ests as to<br />
effects of immissions coming from the mill<br />
h Monitoring of soils and precipitation (snow)<br />
possibly affected by emissions from the mill<br />
All projects of the 2003 environmental programme were pushed ahead and<br />
realised in accordance with projected requirements and schedules. Only the<br />
conversion of the long fibre pulp bleaching at Syktyvkar to 100% ECF planned<br />
<strong>for</strong> 2004/2005 will be delayed on account of the extended scope of the project.