ppc riebeeck mine and cement factory - Aurecon AME ...
ppc riebeeck mine and cement factory - Aurecon AME ...
ppc riebeeck mine and cement factory - Aurecon AME ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PPC Riebeeck West: Storm water Management Plan Page 113<br />
Annually fire breaks around the perimeter of the mining area <strong>and</strong> clearing of<br />
vegetation around buildings that is potentially a fire hazard will be undertaken<br />
All uncontrolled veldt fires on Riebeeck property must be reported to the<br />
emergency controller. It‟s the responsibilities of all the employees to inform<br />
about a fire if discovered.<br />
Fires in buildings will be prevented / controlled by:<br />
Fire extinguishers will be available in all buildings.<br />
These extinguishers are checked against work instruction requirements every<br />
month to ensure they are in working order.<br />
The fire extinguishers will be checked by a professional contracted annually.<br />
If the fire cannot be controlled by the person discovering the fire, it will be<br />
report to the emergency controller for appropriate action.<br />
EXTREME FLOODING EVENT<br />
Ongoing<br />
Monthly<br />
Annually<br />
MITIGATION & MANAGEMENT MEASURES TIMEFR<strong>AME</strong>S<br />
The <strong>mine</strong> has implemented storm water prevention measures by constructing<br />
storm water channels, berms <strong>and</strong> catchment dams throughout the mining<br />
property to ensure that all storm water is directed away from the plant <strong>and</strong> areas<br />
where flooding would be a problem.<br />
These storm water channels <strong>and</strong> berms will be annually inspected <strong>and</strong> if<br />
necessary cleaned <strong>and</strong> repaired.<br />
When an abnormal flood occurs at Riebeeck the emergency controller will<br />
arrange a proper action plan to deal with the situation.<br />
RUNAWAY CHEMICAL REACTIONS<br />
Ongoing<br />
Annually<br />
As <strong>and</strong> when<br />
required.<br />
MITIGATION & MANAGEMENT MEASURES TIMEFR<strong>AME</strong>S<br />
All chemical will be stored within the appropriate bunded / protected<br />
environment to reduce the potential of a reaction.<br />
No chemicals that could react together will be stored in the same location.<br />
All MSD sheets will be available for all chemicals stored on the site.<br />
In case of an accident that may result in toxic or hazardous chemicals to run<br />
away <strong>and</strong> pollute the environment, the emergency controller must be contacted.<br />
The emergency controller must without delays arrange an action plan to bring<br />
the pollution under control. For this purpose the Quality Assurance Manager<br />
<strong>and</strong> other personnel may be called upon.<br />
POTENTIAL FOR A RADIATION LEAK<br />
Daily<br />
Daily<br />
Ongoing<br />
As <strong>and</strong> when<br />
required<br />
As <strong>and</strong> when<br />
required<br />
MITIGATION & MANAGEMENT MEASURES TIMEFR<strong>AME</strong>S<br />
Riebeeck will at all times have an appointed radiation protection officer whose<br />
duties will include:<br />
Ensure that all persons who may work near the installation are fully aware of<br />
the associated radiation hazard <strong>and</strong> are familiar with correct work procedures.<br />
The transfer of a radioactive measuring system from one place to another<br />
must take place under the guidance of the radiation protection officer<br />
When the radioactive source is removed from service, the radiation protection<br />
officer must ensure that it is immediately locked away in the approved<br />
isolation container.<br />
Daily<br />
Daily<br />
Ongoing<br />
As <strong>and</strong> when<br />
required<br />
113