PPC Riebeeck West: Storm water Management Plan Page 13<br />

1.5.2 Mining process description<br />

The mining process is outlined in Figure 1.7 below <strong>and</strong> described in the following text.<br />

Figure 1-7: Flow chart of the mining process.<br />

Current mining operations include the mining of the Block A <strong>and</strong> Block B. The short term<br />

intention is to combine Block A <strong>and</strong> B into one pit which is regarded as the Final Pit. Over time<br />

the Final Pit will be deepened (240m in depth) <strong>and</strong> extended in diameter towards the current<br />

plant resulting in the Opti Pit. To ensure continued limestone supplies future mining will involve<br />

the opening up <strong>and</strong> development of the Delectus Pit (in over 30 years).<br />

The mining department can be separated up into the following sub-headings:<br />

1.5.3 Mine <strong>and</strong> resource planning<br />

The aim of any mining operation should be to ensure optimal utilisation of the <strong>mine</strong>ral<br />

resources. In order to achieve this aim at PPC Riebeeck, <strong>mine</strong> <strong>and</strong> resource planning is critical.