PPC Riebeeck West: Storm water Management Plan Page 27<br />
1.6.7 Plant upgrade project:<br />
With the changes in environmental legislation concerning emissions, PPC will be required to<br />
upgrade / replace equipment at PPC Riebeeck to remain compliant when the new regulations<br />
(<strong>and</strong> the associated minimum emission st<strong>and</strong>ards) come into effect.<br />
The existing plant infrastructure lends itself to a combination of upgrading <strong>and</strong> repla<strong>cement</strong> of<br />
equipment cost effectively, while maximising the use of the current plant infrastructure <strong>and</strong><br />
equipment. Accordingly old equipment would be replaced to ensure process efficiency <strong>and</strong><br />
associated compliance with legislated air quality st<strong>and</strong>ards. The upgrade would also allow for<br />
optimising energy <strong>and</strong> raw material use efficiency. PPC subsequently appointed an<br />
environmental consulting company to undertake the requisite authorisation processes required<br />
for the proposed PPC Riebeeck upgrade project. What PPC is proposing:<br />
Upgrade certain sections of the existing PPC Riebeeck <strong>cement</strong> manufacturing plant with the<br />
view to increase the clinker production capacity from the current 570 Kiloton/annum to 800<br />
Kilotton/annum via:<br />
Replacing the existing two kilns with one new kiln line;<br />
Decommissioning <strong>and</strong> removing the two existing kilns;<br />
Upgrading the existing raw milling facility to accommodate the increased production rate;<br />
Installing a new coal mill for indirect firing <strong>and</strong> inert operations;<br />
Upgrading the existing <strong>cement</strong> milling facility to increase the current capacity to<br />
accommodate the increased production rate;<br />
Converting each mill to a closed circuit operation via the installation of a high efficiency<br />
separator;<br />
Upgrading existing conveying equipment to meet the increased production rates; <strong>and</strong> the<br />
Installation of emission abatement technology to improve air quality.<br />
No changes are proposed for other on-site operations, however additional on-site storage would<br />
be required for fly ash <strong>and</strong> slag which will be used in the process as raw materials.