PPC Riebeeck West: Storm water Management Plan Page 43<br />
management requirements documented as part of the <strong>mine</strong>s ISO 14001:2004 environmental<br />
management commitment.<br />
Cover the management measures required for the proposed new facility when it is<br />
authorised through NEMA.<br />
When the <strong>cement</strong> upgrade project gains authorisation through the EIA completed in terms of<br />
NEMA, it will also have to be covered within the scope of the mining EMP required for the DME.<br />
This EMP will include the management measure for both the construction <strong>and</strong> future operation<br />
of the proposed new <strong>cement</strong> plant.