PPC Riebeeck West: Storm water Management Plan Page 43<br />

management requirements documented as part of the <strong>mine</strong>s ISO 14001:2004 environmental<br />

management commitment.<br />

Cover the management measures required for the proposed new facility when it is<br />

authorised through NEMA.<br />

When the <strong>cement</strong> upgrade project gains authorisation through the EIA completed in terms of<br />

NEMA, it will also have to be covered within the scope of the mining EMP required for the DME.<br />

This EMP will include the management measure for both the construction <strong>and</strong> future operation<br />

of the proposed new <strong>cement</strong> plant.