PPC Riebeeck West: Storm water Management Plan Page 9<br />

1.5 OVERVIEW OF MINING OPERATIONS<br />

1.5.1 EXISTING FACILITY<br />

The purpose of this section is to provide the reader with a brief description of the activities<br />

taking place at Riebeeck <strong>and</strong> to ensure that the environmental management measures (in<br />

Section 6) can be assigned to specific activities.<br />

The description of the activities is linked to the organisational flow of the <strong>mine</strong>. The<br />

organisational flow includes the core processes which are:<br />

Mining<br />

Production<br />

Packaging <strong>and</strong> logistics (dispatch of product)<br />

In addition to the core processes, PPC Riebeeck have the following supporting processes:<br />

Quality assurance<br />

Risk management (including environmental management)<br />

Engineering<br />

Administration / Stores<br />

Organisational performance.<br />

The description of the activities has been provided in a chronological order which follows the<br />

mining of the limestone, shale, s<strong>and</strong> <strong>and</strong> clay through to production <strong>and</strong> dispatch of the clinker /<br />

<strong>cement</strong> from the plant, followed by a description of the supporting services to ensure the<br />

smooth operation of the <strong>mine</strong>. This section describes both the existing operations <strong>and</strong> the<br />

intended <strong>cement</strong> expansion project.<br />

The description of the activities is interlinked into the PPC Riebeeck aspect register which was<br />

developed for the implementation of the ISO 14001:2004 environmental management system.<br />

The following figures have been provided to assist in the readers underst<strong>and</strong>ing of the<br />

description of the activities that take place on the site:<br />

Figure 1.4 provides a diagrammatic indication of the overall process that takes place on<br />

the site. This diagram is interlinked into the organisational flow at Riebeeck.<br />

Figure 1.5 provides an aerial photograph of the whole of the site.<br />

Figure 1.6 provides an aerial photograph of the current plant area <strong>and</strong> a brief<br />

description of the function of each building.