ppc riebeeck mine and cement factory - Aurecon AME ...
ppc riebeeck mine and cement factory - Aurecon AME ...
ppc riebeeck mine and cement factory - Aurecon AME ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PPC Riebeeck West: Storm water Management Plan Page 28<br />
1.7 PACKING AND LOGISTICS<br />
As <strong>and</strong> when the OPC <strong>and</strong> the Rapo <strong>cement</strong> enter the various <strong>cement</strong> silos, it becomes the<br />
responsibility of the Packaging <strong>and</strong> Logistic Department, for the dispatch in either in bulk, bags<br />
or 1.5 ton bags. The department is also responsible for the acceptance of delivery of raw<br />
materials via rail or road. For an indication of the various buildings associated with the<br />
customer services department refer to Figure 1.6. Currently approximately 370,000 tons of<br />
<strong>cement</strong> is being dispatched from PPC Riebeeck per annum. The <strong>cement</strong> is transferred from<br />
silos through air slides <strong>and</strong> screw conveyors.<br />
Figure 1.15 provides an overview of the activities implemented by Packing <strong>and</strong> Logistics<br />
Department.<br />
Figure 1-15: Flow chart of the activities implemented by the Packaging <strong>and</strong> Logistics<br />
Department.<br />
On average (subject to market dem<strong>and</strong>) the distribution of <strong>cement</strong> is as follows:<br />
20% of <strong>cement</strong> produced is Rapo<br />
o Rapo – 40% distributed in bags, 60% in bulk<br />
80% of <strong>cement</strong> produced is OPC<br />
o OPC – 10% distributed in bags, 90% in bulk.<br />
Approximately 30% of <strong>cement</strong> distributed by rail <strong>and</strong> 70% by road.<br />
Clinker can be transferred to other PPC operations in bulk either by rail or road.