04.05.2013 Views

EIA-REP-325d-12 _BB_ - 201.09.14.pdf - SAHRA

EIA-REP-325d-12 _BB_ - 201.09.14.pdf - SAHRA

EIA-REP-325d-12 _BB_ - 201.09.14.pdf - SAHRA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Significance With<br />

Mitigation (WM)<br />

<strong>EIA</strong>-<strong>REP</strong>-<strong>325d</strong>-11<br />

October 20<strong>12</strong><br />

<strong>12</strong>7<br />

MEDIUM<br />

Source of impact:<br />

Mining activities and construction of an access road during the Operational Phase<br />

Description of impact:<br />

Wetland habitat in the region of the study site shelters several sensitive faunal and invertebrate species.<br />

Cumulative disturbance of the natural vegetation cover in the wetland areas and also in the surrounding<br />

landscape will result in the eventual loss of this habitat type, and consequently to the loss of the species<br />

dependant on the vegetation cover.<br />

Significance:<br />

The overall significance of the impact on the wetland habitats is considered to be medium after the<br />

implementation of mitigation measures.<br />

Mitigation:<br />

• No mining activities should take place within buffered the wetland areas or in their associated buffer<br />

zones.<br />

• Wetland areas and their associated buffer zones should be fenced during the construction phase to<br />

prevent any human activity from encroaching onto these areas.<br />

• Wetland areas outside the study area that are affected by access to the site by machinery and the<br />

labour force should also be fenced off and protected.<br />

• No animals may be trapped, hunted or handled in any way.<br />

• No vegetation may be collected or used for firewood.<br />

Table 23: Altered Hydrological Regime<br />

Activity Mining Activities during the Operational Phase<br />

Nature of the<br />

impact<br />

Altered Hydrological Regime Status -<br />

Receiving<br />

environment<br />

Magnitude<br />

Weighting factor<br />

(WF)<br />

Mitigation<br />

Efficiency (ME)<br />

Significance<br />

Significance With<br />

Mitigation (WM)<br />

Water resources associated with the Usutu site<br />

Extent (footprint; site; regional; national; international) SITE<br />

Intensity (low; medium; high) HIGH<br />

Duration (short; short-med; medium; long; permanent) LONG<br />

Probability (Improbable; possible; likely; highly likely; definite) HIGHLY LIKELY<br />

WF (low; low-medium; medium; medium-high; high) HIGH<br />

ME (high; medium-high; medium; low-medium; low) MEDIUM<br />

Without<br />

mitigation<br />

(WOM)<br />

With<br />

mitigation<br />

(WM)<br />

MEDIUM<br />

(Extent + Intensity + Duration + Probability) x Weighting Factor<br />

(2 + 5+ 4+ 4) x 5 = 75<br />

Medium – High<br />

WOM x ME = WM<br />

75 x 0.6 = 45<br />

Medium

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!