It is recommended that the following area be managed to ensure that dust fallout across the site do not increase<br />

to such levels that the dust exceeds the 2400 mg/m 2 /day.<br />

Pollution Control Dam Design Report<br />

The conclusions that were reached during the design process can be summarised as follows:<br />

• Choose an appropriate lining to be used when constructing the pollution control dam;<br />

• Construct a 4 450m 3 pollution control dam with emergency overflow at the position to be determined on<br />

site;<br />

• Construct trenches / berms in close proximity to the mining activities to minimise the amount of clean<br />

water (storm water run-off) that will infiltrate into the mining area; and<br />

• Construct trenches / berms (channel type <strong>12</strong>) with 2 000mm base width and minimum 660mm depth at<br />

minimum 1:50 gradient<br />

Geohydrological Report<br />

The results of the investigation were:<br />

• Groundwater levels were measured in twelve boreholes during a hydrosensus conducted in November<br />

2011 for the proposed Usutu opencast on the Farm Janhendriksfontein portion 263 IT and Transitu 257<br />

IT. The depth of the static groundwater level was found to vary between 1m and 10m below ground level;<br />

• A seasonal aquifer perched on the bedrock probably develops in the upper weathered soil layer,<br />

especially after high rainfall events. Flow in the perched aquifer is expected to follow the surface contours<br />

closely and emerge as fountains or seepage at lower elevations;<br />

• From the chemical analysis of thee water samples an overall assumption can be made that the<br />

groundwater sampled in the proposed mining area is of poor quality and not acceptable for domestic use.<br />

It can be deducted from the water quality of the sampled boreholes that the groundwater has been<br />

negatively affected by historic mining related contaminants;<br />

• The acid base analysis (ABA) of exploration drill cores from the six opencast areas showed material that<br />

is intermediate to potentially acid forming material;<br />

• Geophysics indicated that structures such as dykes are present across the opencast mining area.<br />

Surface water Report<br />

Resource Sensitivity and Integrity<br />

sThe Present Ecological State (PES) of the Witpuntspruit is classified as moderately modified (class C). This<br />

status is caused by upstream anthropogenic and agricultural activities as well as mining operations in close<br />

proximity to the stream.<br />

In addition the area is characterised by 14 hectares of seasonal wetlands and permanent wet zones. All wetlands<br />

in the area are described as palustrine wetland types with areas adhering to non-channelled and valet bottom<br />

descriptions. Most of the wetlands in the study area obtained a low PES category status. In terms of the wetland<br />

study it was found that the biodiversity of the wetlands range from sensitive to less sensitive in the study area.<br />

The wetlands are considered to be of ecological importance and sensitivity but due to their current low<br />

significance status rehabilitation measures need to be instated.<br />

<strong>EIA</strong>-<strong>REP</strong>-<strong>325d</strong>-11<br />

October 20<strong>12</strong><br />

167