EIA-REP-325d-12 _BB_ - 201.09.14.pdf - SAHRA
EIA-REP-325d-12 _BB_ - 201.09.14.pdf - SAHRA
EIA-REP-325d-12 _BB_ - 201.09.14.pdf - SAHRA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 33: Assessment of the possible impacts on visual aspects ........................................................................ 141<br />
Table 34: Visual Assessment Criteria (VAC) ratings ......................................................................................... 142<br />
Table 35: Site evaluation ............................................................................................................................ 143<br />
Table 36: The impact of vegetation clearance and topsoil stripping on soil erosion and surface water runoff ................. 144<br />
Table 37: Soil pollution .............................................................................................................................. 147<br />
Table 38: Soil pollution as a result of incorrect stockpiling .................................................................................. 148<br />
Table 39: The impacts of the development on heritage resources ....................................................................... 150<br />
Table 40: Impact on employment ................................................................................................................. 151<br />
Table 41: Impact on traffic .......................................................................................................................... 152<br />
Table 42: Summary of the impact significance ................................................................................................ 164<br />
Table 43: Land capability classes of different management units......................................................................... 172<br />
<strong>EIA</strong>-<strong>REP</strong>-<strong>325d</strong>-11<br />
October 20<strong>12</strong><br />
FIGURES<br />
Figure 1: The Regulation 2(2) map of the Usutu Coal Colliery ............................................................................... vi<br />
Figure 2: Cross section 1 from west to east looking north through the northern portion of the proposed mining area ..........vii<br />
Figure 3: Cross section 2 from west to east through the main pit north of Camden Village .......................................... viii<br />
Figure 4: Cross section 3 from north to south looking east into the proposed mining area ............................................ ix<br />
Figure 5: Diagram illustrating roll-over coal mining methodology ........................................................................... 47<br />
Figure 6: Mining layout plan .......................................................................................................................... 69<br />
Figure 7: Mining layout plan for opencast areas................................................................................................. 70<br />
Figure 8: Witpuntspruit catchment area ........................................................................................................... 76<br />
Figure 9: Tertiary and quaternary drainage regions in the vicinity of Usutu Colliery (situated in Water Management Area 8)<br />
.............................................................................................................................................................. 78<br />
Figure 10: The four phases of an <strong>EIA</strong> ............................................................................................................. 94<br />
Figure 11: Description of biophysical assessment parameters with its respective weighting ...................................... 107<br />
Figure <strong>12</strong>: An example of an open cast mine depicting the visual impact .............................................................. 111<br />
Figure 13: Contour mining in Brazil ............................................................................................................... 1<strong>12</strong><br />
Figure 14: Underground coal mining methodology ........................................................................................... 114<br />
Figure 15: The identification of cumulative impacts .......................................................................................... 155<br />
Originated By: Reviewed By: Approved By:<br />
Name: Ilze Ueckermann Retha Weir Vernon Siemelink<br />
Designation: Senior Specialist Quality Reviewer Senior Specialist<br />
Signature:<br />
Date: 20<strong>12</strong>/09/14 20<strong>12</strong>/10/30 20<strong>12</strong>/11/02<br />
© Environmental Assurance (Pty) Ltd. All Rights Reserved - This documentation is considered the intellectual property of Environmental<br />
Assurance (Pty) Ltd and the client. Unauthorised reproduction or distribution of this documentation or any portion of it may result in severe<br />
civil and criminal penalties, and violators will be prosecuted to the maximum extent possible under law.<br />
xxxii