• All construction areas should be suitably top soiled and vegetated as soon as is possible after mining;<br />

• Disturbed surfaces to be rehabilitated must be ripped, and the area must be backfilled with topsoil or<br />

overburden.<br />

• Footprint size should be kept at a minimum so as to maintain as much natural vegetation cover as<br />

possible;<br />

• Only vegetation indigenous to the area should be considered for rehabilitation purposes; and<br />

• Wastewater limit values applicable to discharge of wastewater into watercourses as stipulated by the<br />

Department of Water Affairs and Forestry should be strictly adhered to.<br />

13.4 Noise<br />

13.4.1 Increased Noise and vibration<br />

Table 31: Assessment of the possible impacts on Noise and Vibration during the construction and operational<br />

phase<br />

Activity Noise generation on site during the construction and operational phase<br />

Nature of the<br />

impact<br />

Receiving<br />

environment<br />

Magnitude<br />

Weighting factor<br />

(WF)<br />

Mitigation<br />

Efficiency (ME)<br />

Significance<br />

Significance With<br />

Mitigation (WM)<br />

<strong>EIA</strong>-<strong>REP</strong>-<strong>325d</strong>-11<br />

October 20<strong>12</strong><br />

Blasting and construction activities which generate noise that<br />

exceeds the current ambient noise levels experienced over the<br />

site and surrounding areas<br />

Machine operators and workers, surrounding communities<br />

138<br />

Status -<br />

Extent (footprint; site; regional; national; international) REGIONAL<br />

Intensity (low; medium; high) LOW<br />

Duration (short; short-med; medium; long; permanent) LONG-TERM<br />

Probability (Improbable; possible; likely; highly likely; definite) HIGHLY LIKELY<br />

WF (low; low-medium; medium; medium-high; high) LOW MEDIUM<br />

ME (high; medium-high; medium; low-medium; low) MEDIUM HIGH<br />

Without<br />

mitigation<br />

(WOM)<br />

With<br />

mitigation<br />

(WM)<br />

LOW<br />

(Extent + Intensity + Duration + Probability) x Weighting Factor<br />

(3 + 1+ 4+ 4) x 2 = 24<br />

Low to Medium<br />

WOM x ME = WM<br />

24 x 0.4 = 9.6<br />

Low<br />

Source of the impact:<br />

Possible sources of disturbing noise of the Vunene Colliery (Pty) Ltd are listed in table 30. Of these sources,<br />

those with the greatest potential to be disturbing are:<br />

• Increase noise levels from vehicular traffic and other equipment associated with the construction of the<br />

proposed mine; and<br />

• Vibrations and noise associated with blasting.