Weighting factor<br />

(WF)<br />

Mitigation<br />

Efficiency (ME)<br />

Significance<br />

Significance With<br />

Mitigation (WM)<br />

<strong>EIA</strong>-<strong>REP</strong>-<strong>325d</strong>-11<br />

October 20<strong>12</strong><br />

Probability (Improbable; possible; likely; highly likely; definite) DEFINITE<br />

WF (low; low-medium; medium; medium-high; high) HIGH<br />

ME (high; medium-high; medium; low-medium; low) HIGH<br />

Without<br />

mitigation<br />

(WOM)<br />

With<br />

mitigation<br />

(WM)<br />

HIGH<br />

(Extent + Intensity + Duration + Probability) x Weighting Factor<br />

(5 + 5+ 5+ 5) x 5 = 100<br />

High<br />

WOM x ME = WM<br />

100 x 0.2 =20<br />

High<br />

Source of the impact<br />

Development related traffic can access the external road network at various points and thereafter several route<br />

choices are available (towards Camden Power Station or alternatively towards Ermelo, ot even Piet Retief). The<br />

bulk of the coal from this colliery is sent to the Camden Power Station and the balance to other users via the N2<br />

through Ermelo. The roads that can be used are briefly discussed below:<br />

N2<br />

The N2 between Ermelo and Piet Retief is currently being upgraded with road works on the entire section<br />

between the Camden Power Station / Usutu West Colliery and Ermelo. It can be assumed that this road will be in<br />

good condition as depicted in the photos taken along this section of the N2.<br />

The existing access to Usutu West Colliery is currently being upgraded as part of the N2 road upgrade. A<br />

temporary access is currently in use opposite the access to Camden Power Station.<br />

Description of the impact<br />

Trip generation<br />

No accommodation is provided on the mine and staff reside mainly in Ermelo. Around the shift change time, the<br />

3 busses drop off the new shift staff and pick up the staff from the previous shift and return to Ermelo.<br />

The operation is in two shifts with the following shift change times:<br />

• 05:00 – 17:00; and<br />

• 17:00 – 05:00<br />

The mine provide 3 X 16 seater busses for transport to and from the mine. It is assumed that the balance of the<br />

staff use own transport with an average of 2 people per vehicle.<br />

In terms of the Manual for Traffic Impact Studies, intersections where more than 75 peak hour trips are added to<br />

the critical movements must be analysed to determine the impact of the additional traffic on the operating<br />

conditions of the intersection. In this instance, this is not expected at any of the major intersections. There are<br />

two (2) access scenarios which are being investigated:<br />

The design scenarios will be applied to both access options, one access as well as two access points.<br />