SYNOPSIS<br />
INTRODUCTION<br />
Environmental Assurance (Pty) Ltd (Envass), as an independent environmental consultant has been appointed<br />
by Vunene Mining (Pty) Ltd to undertake the Environmental Impact Assessment (<strong>EIA</strong>) for the proposed opencast<br />
and surface coal mining on Leeuwenburg 137 IT, Roodewal 270 IT, Holbank 265 IT, Vlakfontein 266 IT,<br />
Vlakfontein 269 IT, Mooiplaats 290 IT, Witpunt 267 IT, Transutu 257 IT and Jan Hendriksfontein 263 IT, in the<br />
Msukaligwa Local Municipality.<br />
The Usutu Coal Colliery opencast mine is located 18 kilometres south east of Ermelo. This is an existing coal<br />
mine which was under care and maintenance for a period, subsequent to which mining operations were<br />
restarted. However, subsequent to the issuing of the mining right (dated 10 July 2009); a desktop study was<br />
undertaken which revealed that the mining area was mined before by Ingwe (Usutu Colliery). The area was<br />
mined by means of underground mining methods.<br />
Environmental Assurance was appointed by Vunene Mining (Pty) Ltd to undertake the environmental<br />
authorisation process for the coal mining process. Issues which would specifically be addressed in this report are<br />
amongst others:<br />
• Opencast mining methods which will be used to extract the coal;<br />
• Underground mining methods which will be used to extract deeper coal;<br />
• Existing infrastructure at the Usutu Colliery;<br />
• Mining and blasting operations;<br />
• Surrounding infrastructure and land uses; and<br />
• In detail environmental impact assessment of activities undertaken on site.<br />
The Environmental Impact Assessment (<strong>EIA</strong>) process followed is in compliance with the National Environmental<br />
Management Act, 1998 (Act 107 of 1998), as amended and the Environmental Impact Assessment Regulations<br />
of 2010 (Government Notice No’s R544, 545 and 546 in Government Gazette No. 33306 of 18 June 2010). The<br />
proposed coal mining operations constitutes a listed activity which falls within the scheduled activities listed in<br />
Government Notice Regulation No 545 (Scoping and <strong>EIA</strong>). Prior to such a listed activity being approved, it is<br />
required that an environmental process is undertaken and a report is submitted to the relevant environmental<br />
authority for consideration.<br />
The <strong>EIA</strong> process includes the completion of the Scoping Report as well as an Environmental Impact Assessment<br />
Report. The Scoping Report determined the issues or concerns from the relevant authorities as well as interested<br />
and/or affected parties. In addition, an Impact Assessment Report (this report) will determine the likely<br />
consequence that the proposed coal mining may have on the environment.<br />
PROJECT DESCRIPTION<br />
Usutu Colliery is a coal mine situated on certain portions of the farms Leeuwenburg 137 IT, Roodewal 270 IT,<br />
Holbank 265 IT, Vlakfontein 266 IT, Vlakfontein 269 IT, Mooiplaats 290 IT, Witpunt 267 IT, Transutu 257 IT and<br />
Jan Hendriksfontein 263 IT, in the Msukaligwa Local Municipality, approximately 18 kilometres southwest of the<br />