7.3.7 Potable water plant<br />
Potable water is supplied by Camden Power Station and is capable of meeting the proposed mine’s potable<br />
water requirements. The potable water is pumped from Camden Power Station via a 152mm diameter pipeline to<br />
a 75 000 cubic litre reservoir / header tank located on Usutu Coal Colliery from where it is further reticulated for<br />
mine use.<br />
The potable water facility can supply water to the reservoir / header tank at a rate of 500 litres per hour if<br />
required. Booster pumps could further increase this supply rate if required.<br />
7.3.8 Mineral processing plant<br />
The proposed mine will not be beneficiating coal, hence no coal processing or dense medium plants will be built<br />
on site. Only existing infrastructure will be utilised.<br />
Coal will be tipped over the grizzly or scalping screen, undersize material will pass through the grizzly that will<br />
have an aperture of 600mm. The minus 600mm will enter the in-pit mobile crusher where it will be reduced to<br />
minus 200mm. The minus 200mm crushed coal product will be directed via a transfer chute to an in-pit overland<br />
conveyor that will transport the minus 200mm crushed coal to the existing Camden overland belt infrastructure.<br />
Transfer of coal from the in-pit overland conveyor will be facilitated by transfer chute, with coal always being<br />
tipped on overland conveyor B.<br />
The minus 200mm crushed coal will be conveyed through Conveyor B to Conveyor C, through Conveyor D<br />
where it will be transferred via a McNally to a double set of jaw crushers, where the minus 200mm coal is<br />
crushed to a minus 40mm size fraction and conveyed via Conveyor E into Camden Power Station. Run of Mine<br />
(ROM) coal loaded onto the stockpile area will be approximately 40mm.<br />
7.3.9 Workshops, administration and other buildings<br />
The existing Usutu Coal Colliery infrastructure will be used in the proposed mine operations. No new<br />
infrastructure areas will be developed.<br />
The following existing infrastructure facilities will be utilised:<br />
• Existing main office block;<br />
• Existing mine change rooms;<br />
• Existing first aid station;<br />
• Existing mine stores (2);<br />
• Existing workshops;<br />
• Existing hostels;<br />
• Existing sub-stations<br />
• Existing road infrastructure; and<br />
• Existing sewage plant.<br />
<strong>EIA</strong>-<strong>REP</strong>-<strong>325d</strong>-11<br />
October 20<strong>12</strong><br />
67