Depth-to-groundwater Procedures and Frequency of Monitoring and Reporting<br />

The depth-to-static-groundwater level will be obtained at each well using an electric water-level<br />

sounder with a cable graduated in increments of 0.01 foot. Before measurement, monitoring<br />

staff will need to review the WMLB for the location of the reference point and measurement<br />

access port. A crescent wrench may be needed to access the well casing for measurement.<br />

Monitoring staff will need to also review past measurements in the WMLB to allow for careful<br />

lowering of the probe or tape. 3 To obtain a depth-to-water measurement, the electric sounder<br />

cable or tape will be lowered into the well to within 20 feet short of past measurements taken in<br />

the same season of the year, spring or fall.<br />

Monitoring staff will continue to slowly lower the probe through the access port until the<br />

sounder indicates submergence by either a beeping sound or a light, depending on the type of<br />

signal installed for that particular model. At this point, the sampling personnel will note the<br />

depth to water (to the nearest 0.01 foot) from the reference point. The depth will be confirmed<br />

by lifting the sounder above the water surface by about 2 to 3 feet and then remeasuring the<br />

depth to water. If the depth remains constant, the depth to water will be recorded on Figure 6-1<br />

(DWR Form 1213, Page 18). If measurements are showing change with each measurement, the<br />

monitoring staff will indicate the issue on the form and, with it, attach a graphic curve of the<br />

variable nature of the measurement, and its possible cause (e.g., bouncing, recovering water<br />

level).<br />

5.3 QUALITY CONTROL<br />

After completing their field work, the monitoring staff will enter the data into an electronic<br />

database management system. The monitoring staff will review the groundwater-level and water<br />

quality data for accuracy within 5 days of obtaining the measurements. Should a measurement<br />

appear suspicious, a groundwater level confirmation reading will be obtained.<br />

3<br />

Tape measurements will require chalking of the tape and repeated measurements as per the CASGEM Guidelines<br />

(Page 15).<br />