03.07.2013 Views

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Australian</strong> <strong>Maritime</strong> <strong>College</strong><br />

APPENDIX 2.5<br />

ENGINE ROOM - TO PARALLEL ALTERNATORS,<br />

No. 1 ON LOAD, No. 2 INCOMING<br />

ONCE A.E. 2 HAS BEEN RUNNING FOR 5 MINUTES<br />

1. Turn Synchronising Switch from No. 1 to Pos. 1–2.<br />

NOTE: If synchronising switch is turned to Pos. No 2, ship will blackout.<br />

2. Turn Synchroscope Switch to Pos. 1–2.<br />

3. Adjust No. 2 Speed until Synchroscope creeps clockwise.<br />

Remember: Turn switch anticlockwise to raise speed.<br />

4. Close No. 2 Breaker when needle between 10 and 11 o’clock.<br />

No. 2 now on board.<br />

5. Raise No. 2 Speed to Balance Load.<br />

6. Turn Excitation Switch (on separate panel, Pt side) from Single to Parallel.<br />

7. Monitor and adjust load levels until Governor Droop Stabilizers.<br />

Append 2.5 - Alternators.docx 1<br />

Revised: November 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!