03.07.2013 Views

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Australian</strong> <strong>Maritime</strong> <strong>College</strong><br />

APPENDIX 1.17<br />

BRIDGE – BOW THRUSTER OPERATION<br />

<strong>MV</strong> <strong>BLUEFIN</strong> is fitted with 1 bow thruster, the operation of this system is as follows.<br />

1. Main hydraulics must be turned on in the engine room.<br />

2. The selector switch on the aft trawl winch console must be on.<br />

3. The switch on the bow thrusters control must be on.<br />

4. Test the system by rotating the leaver to starboard and port, the vessels head should<br />

move in the corresponding direction.<br />

5. If the ships head does not respond, check that all systems are turned on.<br />

Append 1.17 - Bow Thruster.docx 1<br />

Revised: November 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!