While shooting and hauling takes place, it is imperative that all participants have a<br />

complete understanding of the risks regarding entanglement and working around high<br />

tension ropes, crab pots and large moving objects, This activity involves the full<br />

complement of ships crew and lecturing staff, and the use of appropriate PPE.<br />

Following a thorough briefing the ship’s crew members, the crew must be prepared to<br />

overrule any practice which they deem to be unsafe, or to the contrary of any recognised<br />

procedures.<br />

Weather conditions must be fully assessed before crab fishing activates are undertaken.<br />

Equipment used<br />

1. Standby hydraulics are engaged during the deployment and retrieval. To be engaged<br />

by the Engineer for operation.<br />

2. Pot hauler.<br />

3. Lifting Equipment.<br />

4. Public address system.<br />

5. Hand held UHF Radios.<br />

6. PPE.<br />

Procedure<br />

Only qualified ship’s crew may use the hydraulic controls for the shooting and retrieval of<br />

the Giant crab equipment.<br />

Only ship’s crew may be involved in the deployment of crab fishing equipment.<br />

Shooting<br />

Shooting the Crab pots involves the deployment of float line followed by the crab pots x 8<br />

attached to the main line by the means of a spliced line (Tail or Branch line).<br />

This line allows the pots to be attached to the mainline.<br />

The crab pots are placed in order on the timber deck with a rectangular pot joined on to<br />

the first tale and the float line secured to the stern, by means of a quick release clip.<br />

Once a suitable location is found the vessel speed is slowed to 2.5 to 3 knots then the<br />

shooting process starts.<br />

The quick release clip on the float line is released allowing the drag created to assist in<br />

dragging the 1 st pot down the stern ramp, and then the tales are then attached to the pots<br />

in order as the main line is paid out from the rope basket.<br />

The combined weight and drag created allows the remanning pots to be pulled down the<br />

stern ramp, until the last pot is deployed then the 2nd float line follows as this is attached<br />

to the last pot the vessel remains at 3 knots until all the remaining float line and floats are<br />

clear of the vessel this now completes the shooting process<br />

Append 3.8 - Crab Fishing.docx 2 of 4<br />

Revised: November 2010