03.07.2013 Views

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

MV BLUEFIN QUALITY MANUAL - Australian Maritime College

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Australian</strong> <strong>Maritime</strong> <strong>College</strong><br />

Students under instruction and involved in a practical training exercise showing how to use<br />

the derrick in the working environment, are the responsibility of the lecturer running that<br />

class. The lecturer must obtain permission from a member of the ship’s crew prior to using<br />

the derrick and clearly demonstrate its operation to students before allowing them to use<br />

the controls.<br />

During such an exercise, the lecturer will be close to the operating controls at all times<br />

should it be necessary to assume immediate, overall control.<br />

Any personnel other than those detailed to assist in derrick operations, are to keep well<br />

clear of the working area. The person in charge has authority to ‘STOP WORK’ and order<br />

persons to ‘KEEP CLEAR’. Such an order can be transmitted using the public address<br />

system to the main deck (the microphone is on the control console). Work is only to be<br />

resumed when the area is safe.<br />

Tag Line(s)<br />

A tag line(s), of sufficient length that it may be passed from ship to shore, is to be attached<br />

throughout the process of transferring loads to prevent it swinging and to assist in its<br />

positioning.<br />

Power supply<br />

Only the ‘Stand by’ hydraulic pump may be used for derrick operation. NEVER use ‘Main’<br />

hydraulics. The main supply runs off the main engines and generates too much power to<br />

control the derrick in a safe and steady fashion.<br />

Using the derrick at sea<br />

Great care is to be exercised when using the derrick while the ship is at sea. Under no<br />

circumstances should the equipment be used whilst the ship is rolling. The vessel’s<br />

movement must be limited to the bare minimum necessary to maintain steerage only in a<br />

following or head sea and swell. At no time is the load to be raised any higher than the<br />

absolute minimum sufficient to move it to a new location. Tag lines MUST be attached<br />

securely and attended constantly until the operation is complete.<br />

Using the derrick to launch or retrieve the ship’s tender<br />

The reader’s attention is drawn to the specific instructions and procedure “Ship’s Tender<br />

Launch and Recovery” located in the Operational Safety and Training Manual prior to<br />

attempting any boat/derrick exercise. There is a real potential for damage and danger.<br />

Seek assistance from someone who has done this before.<br />

Append 3.1 - Derrick.docx 2 of 2<br />