22.07.2013 Views

Arani Town - Municipal

Arani Town - Municipal

Arani Town - Municipal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter - 13 Final Report: <strong>Arani</strong> <strong>Municipal</strong>ity<br />

assets including infrastructure facilities. The intangible benefits of social facilities also<br />

need to be considered in the process.<br />

4. Digitisation of asset register<br />

Focus should be placed on designing, testing and installing a database<br />

management system for municipal assets. All data, once complied should be<br />

classified on the basis of sector specific infrastructure facilities, land and properties.<br />

Specific software should be customized to suit local requirements and data should<br />

be translated into specified formats.<br />

5. Training in database management<br />

Training is the most important part of an asset management plan. Training should<br />

emphasize methods of simplified updation of data, and methods of monitoring and<br />

follow-up relating to infrastructure facilities management, land use, litigation,<br />

encroachment, values, expenditure and revenue flows.<br />

13.2 INFRASTRUCTURE ASSETS<br />

Infrastructure Assets will include all movable and immovable equipments and<br />

properties including water supply, drainage, sewerage, solid waste management,<br />

roads, street lighting etc. Unlike other assets of the municipality, these assets undergo<br />

constant use, wear and tear, addition, repair etc. This correspondingly changes their<br />

values and hence a constant value updating is necessary.<br />

13.2.1 MOVABLE AND IMMOVABLE ASSETS<br />

Water Supply<br />

Public Fountains - 152 nos<br />

Hand Power pumps - 281 nos<br />

Mini Power pumps - 44 nos<br />

H.S.C.s - 5200 nos<br />

OHTSs - 6 nos<br />

Sump - 1 nos<br />

Distribution line - 43.01 km<br />

Public Convenience<br />

Public Toilet unit - 12 nos<br />

Vanmbay toilet - 5 nos<br />

Pay & Use toilet - 2 nos<br />

Storm Water Drains<br />

Closed drains - 13 km<br />

Open drains - 21 km<br />

Solid Waste Management<br />

Pushcart - 35 nos<br />

. - 101 -<br />

Voyants Solutions Private Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!