Chapter - 10 Final Report: <strong>Arani</strong> <strong>Municipal</strong>ity<br />

10 CAPIITAL IINVESTMENT NEEDS FOR IIDENTIIFIIED<br />

PROJECTS<br />

All the projects relating to urban infrastructure, urban growth and development<br />

have been identified through a conscious participatory process. The projects are in<br />

the form of improvements and, extension of the existing services and facilities such<br />

that the present inadequacies as per the norms and standards are made up and, in<br />

addition meet the requirements of the projected population of the town during the<br />

perspective period of plan.<br />

Each project component, as identified has been verified in the field of their suitability<br />

and feasibility in terms of location, coverage and adequacy and finalized with as<br />

intensive consultation with the office of the municipality and as suggested and<br />

recommended in the review meetings of the previous stage of this exercise in the<br />

office of TNUIFSL. The projects thus finalized and firmed up are detailed thus finalized<br />

and firmed up are detailed out in their present status, gaps, projected requirements,<br />

cost estimates, capital needs, funding pattern etc in the following section. In all the<br />

identified projects constituting physical and social infrastructure facilities and other<br />

projects including bus stand, remunerating projects are including cost about Rs.<br />

83.76 crores to be implemented starting from the current financial year. These<br />

projects have been prioritized as warranted in their importance over the<br />

implementation time frame.<br />

The projects, breakup of the investment and implementation schedule are given in<br />

the following tables:<br />

Table 10-1: Summery of Capital Investments under CCCBP<br />

S.No. Focus Area Total Cost<br />

1 Water Supply 1351<br />

2 Sewerage & Sanitation 3142.01<br />

3 Solid Waste Management 658.85<br />

4 Drainage 603<br />

5 Traffic & Transportation 1775<br />

6 Streetlight 52<br />

7 Social Infrastructure 329<br />

8 Urban & <strong>Municipal</strong> Reform 70<br />

9 Slum Improvement 395.2<br />

Total 8376.06<br />

10.1 PHYSICAL INFRASTRUCTURE - IMPROVEMENT NEEDS<br />

In chapter -8 we had identified the problems and issues of the Physical Infrastructure<br />

sector and mentioned about the projects identified the municipality for curative<br />

measures in this sector. Here we will discuss about the shortcomings in the projects<br />

. - 69 -<br />

Voyants Solutions Private Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!