Chapter - 10 Final Report: <strong>Arani</strong> <strong>Municipal</strong>ity<br />
10 CAPIITAL IINVESTMENT NEEDS FOR IIDENTIIFIIED<br />
PROJECTS<br />
All the projects relating to urban infrastructure, urban growth and development<br />
have been identified through a conscious participatory process. The projects are in<br />
the form of improvements and, extension of the existing services and facilities such<br />
that the present inadequacies as per the norms and standards are made up and, in<br />
addition meet the requirements of the projected population of the town during the<br />
perspective period of plan.<br />
Each project component, as identified has been verified in the field of their suitability<br />
and feasibility in terms of location, coverage and adequacy and finalized with as<br />
intensive consultation with the office of the municipality and as suggested and<br />
recommended in the review meetings of the previous stage of this exercise in the<br />
office of TNUIFSL. The projects thus finalized and firmed up are detailed thus finalized<br />
and firmed up are detailed out in their present status, gaps, projected requirements,<br />
cost estimates, capital needs, funding pattern etc in the following section. In all the<br />
identified projects constituting physical and social infrastructure facilities and other<br />
projects including bus stand, remunerating projects are including cost about Rs.<br />
83.76 crores to be implemented starting from the current financial year. These<br />
projects have been prioritized as warranted in their importance over the<br />
implementation time frame.<br />
The projects, breakup of the investment and implementation schedule are given in<br />
the following tables:<br />
Table 10-1: Summery of Capital Investments under CCCBP<br />
S.No. Focus Area Total Cost<br />
1 Water Supply 1351<br />
2 Sewerage & Sanitation 3142.01<br />
3 Solid Waste Management 658.85<br />
4 Drainage 603<br />
5 Traffic & Transportation 1775<br />
6 Streetlight 52<br />
7 Social Infrastructure 329<br />
8 Urban & <strong>Municipal</strong> Reform 70<br />
9 Slum Improvement 395.2<br />
Total 8376.06<br />
10.1 PHYSICAL INFRASTRUCTURE - IMPROVEMENT NEEDS<br />
In chapter -8 we had identified the problems and issues of the Physical Infrastructure<br />
sector and mentioned about the projects identified the municipality for curative<br />
measures in this sector. Here we will discuss about the shortcomings in the projects<br />