Arani Town - Municipal
Arani Town - Municipal
Arani Town - Municipal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter - 14 Final Report: <strong>Arani</strong> <strong>Municipal</strong>ity<br />
14 FIINANCIIAL OPERATIING PLAN<br />
14.1 CAPITAL INVESTMENT PLAN<br />
The proposed projects for <strong>Arani</strong> <strong>Municipal</strong>ity taking in to account its resources and<br />
the existing shortfall in services are given below. The projects have been phased<br />
out taking in to account the time-span required for implementation of the project<br />
and the availability of the funds (loans, grants and municipalityís own resources) for<br />
the same.<br />
Table 14-1: Projects to be executed by the <strong>Municipal</strong>ity<br />
S.No. Particulars<br />
Physical Infrastructure<br />
2009-10 2010-11 2011-12 2012-13 2013-14 Total<br />
A Facilities<br />
I Water Supply<br />
Improvements to Water<br />
a) Supply 558.20 792.80 - - - 1351.00<br />
II Sewerage & Sanitation<br />
a) Sewerage Scheme - - 1505.84 1594.17 - 3100.01<br />
III Solid Waste Management<br />
Cost of land fill site and<br />
a) compost yard<br />
Land fill site & compost<br />
158.85 - - - - 158.85<br />
b yard development - 200.00 177.00 - - 377.00<br />
c) Vehicles & Equipment 23.00 30.00 30.00 40.00 - 123.00<br />
IV Strom Water Drains<br />
a) New Drains - - - 181.20 271.80 453.00<br />
b) Upgradation of Drains - - - 150.00 - 150.00<br />
V Roads<br />
Renovation of existing<br />
a) roads - - - 400.00 620.00 1020.00<br />
b) Proposed New Roads - - - - 100.00 100.00<br />
c) Road Widening - - 40.00 - - 40.00<br />
VI Bus Stand<br />
Improvements in Old Bus<br />
a) Stand<br />
Construction of New Bus<br />
- 60.00 - - - 60.00<br />
b) Stand & Shops 175.00 350.00 - - - 525.00<br />
c) Two & Four Wheeler parking - - - 30.00 - 30.00<br />
VII Street Lights<br />
a) Proposed new HM Lights<br />
Retrofitting & energy saving<br />
10.00 10.00 15.00 - - 35.00<br />
b) devices<br />
Social Infrastructure<br />
8.00 9.00 - - - 17.00<br />
B Facilities<br />
I Slum Improvement<br />
a) Improvements to Slums - 100.00 100.00 100.00 95.20 395.20<br />
. - 105 -<br />
Voyants Solutions Private Limited