Preparing for the Test Deployment<br />
Complete the following activities during the preparation stage.<br />
Procedure<br />
Planning and Implementing the <strong>Control</strong> <strong>Manager</strong> Deployment<br />
1. Decide the <strong>Control</strong> <strong>Manager</strong> server and agent configuration for the test<br />
environment.<br />
• Establish TCP/IP connectivity among all systems in a trial configuration.<br />
• Verify bidirectional TCP/IP communications by sending a ping command to<br />
each agent system from the manager system and vice versa.<br />
2. Evaluate the different deployment methods to see which ones are suitable for your<br />
particular environment.<br />
3. Complete a System Checklist used for the pilot deployment.<br />
Selecting a Test Site<br />
Select a pilot site that best matches your production environment. Try to simulate, as<br />
closely as possible, the type of topology that would serve as an adequate representation<br />
of your production environment.<br />
Creating a Rollback Plan<br />
Create a disaster recovery or rollback plan (for example, how to roll back to <strong>Control</strong><br />
<strong>Manager</strong> 5.0/5.5) in case there are some difficulties with the installation or upgrade. This<br />
process should take into account local corporate policies, as well as IT resources.<br />
Beginning the Test Deployment<br />
After completing the preparation steps and System Checklist, begin the pilot<br />
deployment by installing the <strong>Control</strong> <strong>Manager</strong> server and agents.<br />