06.08.2013 Views

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Installation<br />

- Boiler body on transport palet with outside insulation. (Boiler is delevered<br />

with its insulation and in a position that is covered by stretch film)<br />

- 2 unit connection flange mounted to the boiler and ready for welding and 8<br />

unit M16x70 bolts, flanges, nuts and washers fitting to the flanges.<br />

10 www.baymak.com.tr<br />

63 9810.0156 – Rev.04 –12/01/2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!