Installation<br />
- Boiler body on transport palet with outside insulation. (Boiler is delevered<br />
with its insulation and in a position that is covered by stretch film)<br />
- 2 unit connection flange mounted to the boiler and ready for welding and 8<br />
unit M16x70 bolts, flanges, nuts and washers fitting to the flanges.<br />
10 www.baymak.com.tr<br />