63 9810.0156 – Rev.04 –12/01/2007<br />

Installation / System<br />

Filling process must be<br />

finished providing convenient<br />

water pressure to the<br />

installation. ( For the convenient<br />

water pressure value, please get<br />

information from authorized<br />

service and installer company’s<br />

authority ).<br />

Water pressure must not<br />

exceed upper than 3 bar<br />

(maximum operation pressure).<br />

Fillling process must be done by<br />

an expert and relief of the air in<br />

installation must be done<br />

correctly.<br />

After the installation is<br />

filled completely, air relief<br />

process must be done and the<br />

air on the pumps must be<br />

released by activating the<br />

pumps at temporary times.<br />

To release the air on the<br />

pump, opening the wet rotor<br />

sleeve as shown, both turning<br />

direction of pump is checked or<br />

air in the pump is relased<br />

Electricshock Danger! Before protective hat and<br />

pieces of cover is taken out, all electrical connections on<br />

boiler must be disassembled. Works that will be done when<br />

electric is on, must be carried on by authorized people after<br />

all necessary precuations are supplied.<br />