63 9810.0156 – Rev.04 –12/01/2007<br />
Installation / System<br />
Filling process must be<br />
finished providing convenient<br />
water pressure to the<br />
installation. ( For the convenient<br />
water pressure value, please get<br />
information from authorized<br />
service and installer company’s<br />
authority ).<br />
Water pressure must not<br />
exceed upper than 3 bar<br />
(maximum operation pressure).<br />
Fillling process must be done by<br />
an expert and relief of the air in<br />
installation must be done<br />
correctly.<br />
After the installation is<br />
filled completely, air relief<br />
process must be done and the<br />
air on the pumps must be<br />
released by activating the<br />
pumps at temporary times.<br />
To release the air on the<br />
pump, opening the wet rotor<br />
sleeve as shown, both turning<br />
direction of pump is checked or<br />
air in the pump is relased<br />
Electricshock Danger! Before protective hat and<br />
pieces of cover is taken out, all electrical connections on<br />
boiler must be disassembled. Works that will be done when<br />
electric is on, must be carried on by authorized people after<br />
all necessary precuations are supplied.<br />