Installation / System<br />

63 9810.0156 – Rev.04 –12/01/2007<br />

It is suggested that after installation filling and air<br />

ventilation processes are completed, installation pumps<br />

must circulate the water in the system about one hour. It is<br />

neccesary to release last air molecules and activate the<br />

system completely. During the test circulation, pump<br />

and/or pumps must be in use.<br />

Caution: Boiler must not be operated certainly<br />

without providing the water pressure completely and<br />

releasing the air in the installation.<br />

Boiler must be observed for a while after it is<br />

activated, boiler water level must be controlled and<br />

observed constantly by the suitable manometer which<br />

is mounted to a convenable and traceable place in the<br />

installation.<br />

In case of a different pump mounting onto boiler to<br />

provide hot water, circulation lines must be checked<br />

carefully. In case of 4 way valve usage, water heating<br />

installation should be done through another exchanger to<br />

prevent wrong circulation.<br />

Discharging of the Condense Water<br />

Caution! Condense water occured during heating process<br />

must be transferred via an convenable neutralizer<br />

installation(accessory). pH value is between 3 and 4 for<br />

gas fuels and between 2 and 3 for liquid fuels. Therefore<br />

suitable neutralizer must be used.<br />

Condense water line must be installed as slanting.<br />

The line going to channel connection must be seen clearly.<br />

Bottom drainage line must be under the chimney hood<br />

level.<br />

Neutralizer installation is not required for the liquid<br />

fuel which has low rate sulfur (In accordance with ATV note<br />

page A251). Generally , there is no need to neutralizer<br />

installation in the boiler having 200 kW nominal heating<br />

power.<br />

For the neutralization of the boiler outlet water,<br />

local waste water specifications and\or local specifications<br />

must be taken into consideration.<br />