FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Cleaning and Maintenance<br />
7.2 Maintenance<br />
63 9810.0156 – Rev.04 –12/01/2007<br />
Maintenance applications consist of items below;<br />
- Cleaning and control of insulation points and<br />
connections that water passes through,<br />
- Control of regular operation of safety valves and<br />
cleaning from outside.<br />
- Control of operation pressure and water addition if it<br />
is necessary.<br />
- Releasing of the air in installation<br />
Electricshock Danger! For the purpose of<br />
preventing the electricshock in case of touch, all<br />
pieces on boiler which is necessary to be assembled<br />
(especially plating pieces) must be screwed correctly<br />
after operation is completed.<br />
Danger! Maintenance applications must be made by<br />
an authorized installation expert. Please do not try to make<br />
these applications by yourself. Otherwise you may face off<br />
with dangerous situations.<br />
Maintanence Agreement<br />
Maintananence of Heating system installation<br />
should be done properly according to local standards. It is<br />
suggested heating system installation to have complete<br />
maintanence process once in a year. If an agrement is<br />
done with authorized service for maintenance, boiler life<br />
extends and this provides heating system to be operated<br />
for long years economically and safely.<br />
46 www.baymak.com.tr