06.08.2013 Views

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.3 Chimney Connection<br />

63 9810.0156 – Rev.04 –12/01/2007<br />

Installation / System<br />

Caution! Waste gas way must be as short as<br />

possible. Waste gas pipes must be installed as in slanting<br />

direction towards chimney and connections must have full<br />

imperviousness.<br />

The chimney must be designed considering<br />

technical specifications determined in DIN 4705 and built<br />

according to DIN 18160.<br />

Both boiler back pressures and boiler pressures<br />

must be in consideration at chimney calculations.<br />

If the waste gas heat is under 160°C in continuous<br />

operating, it is forbidden to use an ordinary chimney.<br />

Warning! ! To change the burner power may effect<br />

waste gas temperature. It is advised to attach an<br />

absorbtion restrictive for high rating exhaust chimneys.<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!