FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5.3 Chimney Connection<br />
63 9810.0156 – Rev.04 –12/01/2007<br />
Installation / System<br />
Caution! Waste gas way must be as short as<br />
possible. Waste gas pipes must be installed as in slanting<br />
direction towards chimney and connections must have full<br />
imperviousness.<br />
The chimney must be designed considering<br />
technical specifications determined in DIN 4705 and built<br />
according to DIN 18160.<br />
Both boiler back pressures and boiler pressures<br />
must be in consideration at chimney calculations.<br />
If the waste gas heat is under 160°C in continuous<br />
operating, it is forbidden to use an ordinary chimney.<br />
Warning! ! To change the burner power may effect<br />
waste gas temperature. It is advised to attach an<br />
absorbtion restrictive for high rating exhaust chimneys.<br />
37