FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.9 Before First Start -Up<br />
63 9810.0156 – Rev.04 –12/01/2007<br />
Installation<br />
- Check burner connection of burner and<br />
imperviousness of front and back covers at first.<br />
- Interpose ceramic blanket delivered in cardboard<br />
box between burner tube and door installation.<br />
- Check sittings of sensor end protections to slot they<br />
connected to, whether they are correct or not.<br />
- Be careful while choosing burner and check combustion<br />
setup<br />
- Check connection of water and electrical wiring.<br />
- Check water pressure from manometer. If water is not<br />
enough,add water into the system. Because there is closed<br />
expansion tank in the system, check whether system is<br />
filled or not. It is necessary to be released of air if water<br />
impact voice is coming from system.<br />
- Check tightness of front cover filters after first 24 hours<br />
working. If there is looseness, squeeze them.<br />
- Check the rotation of circulation pump whether it is<br />
right or not. If there is overheating or instant increase for<br />
water temperature, check pump turning direction. If the<br />
problem can not be solved, switch off toggle switch of<br />
burner and call service.<br />
- Set desired boiler thermostat value before ignition<br />
- Beware that ventilation channels are always open.<br />
19