06.08.2013 Views

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.4 Training of Operator<br />

63 9810.0156 – Rev.04 –12/01/2007<br />

Training;<br />

Operating/First Start up<br />

The person who will operate the heating system<br />

must have training in detail about operating of system and<br />

operating forms of safe tools and especially informations<br />

that;<br />

- Not to close or cover of air inlet side;<br />

- Functionality control of explosition cover which is<br />

necessary for good combustion ( See, Explosition cover );<br />

- Not to store ignitable substances and fluids near to<br />

boiler;<br />

- Precuations of control that operator must have;<br />

- Control of water pressure of manometer;<br />

- Control of relief valve drain line;<br />

- Release of installation air;<br />

- To be given the information that “applications made<br />

in regular time periods such as maintenance and cleaning<br />

must be gone on by capable heating system experts” .<br />

Documents;<br />

- Instruction including short information about<br />

operation of boiler must be placed to a close area to boiler.<br />

- As documents related with heating system is<br />

delivered, a warning about necessity of location of these<br />

documents where boiler placed must be declared. (DIN<br />

4756).<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!