FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6.4 Training of Operator<br />
63 9810.0156 – Rev.04 –12/01/2007<br />
Training;<br />
Operating/First Start up<br />
The person who will operate the heating system<br />
must have training in detail about operating of system and<br />
operating forms of safe tools and especially informations<br />
that;<br />
- Not to close or cover of air inlet side;<br />
- Functionality control of explosition cover which is<br />
necessary for good combustion ( See, Explosition cover );<br />
- Not to store ignitable substances and fluids near to<br />
boiler;<br />
- Precuations of control that operator must have;<br />
- Control of water pressure of manometer;<br />
- Control of relief valve drain line;<br />
- Release of installation air;<br />
- To be given the information that “applications made<br />
in regular time periods such as maintenance and cleaning<br />
must be gone on by capable heating system experts” .<br />
Documents;<br />
- Instruction including short information about<br />
operation of boiler must be placed to a close area to boiler.<br />
- As documents related with heating system is<br />
delivered, a warning about necessity of location of these<br />
documents where boiler placed must be declared. (DIN<br />
4756).<br />
43