FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
FTA Manual.pdf - Industrial Air
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Operating/Start Up<br />
6. Operation/Start-up<br />
6.1 Operation/Start-up<br />
63 9810.0156 – Rev.04 –12/01/2007<br />
Danger! First start-up must be done by only<br />
authorized service. Before all these applications, expert or<br />
installer of heating system installing and controlling the<br />
installation must check the imperviousness of line, and<br />
declerates the sufficiency of installation to authorized<br />
service. Authorized service checks all parameters that is<br />
necessary for working of the boiler and all substances<br />
mentioned at the top, measures burning values of the<br />
boiler and operates the boiler.<br />
At the unsuitable appications, there is danger risk to<br />
damage to people, envoirement and objects! Devices<br />
which is not started up by authorized services will be out of<br />
warranty and manufacturer company is not responsible for<br />
possible damages.<br />
Attention! It is not allowed heating boiler to be<br />
worked in cicumstances such as building works having<br />
intense dust. Devices may break down.<br />
Injury danger due to hot water! Boiling water may<br />
release from relief valve or drain line for short time when<br />
device is started up.<br />
- Switch on raidator switch.<br />
- Switch on Fuel oil/gas locking mechanism.<br />
- Switch on the switch of boiler line and operating<br />
switch where is on control panel of boiler.<br />
- Arrange essential settings on setup-operating unit<br />
for desired temperature of ambient turning the button.<br />
40 www.baymak.com.tr