06.08.2013 Views

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Operating/Start Up<br />

6. Operation/Start-up<br />

6.1 Operation/Start-up<br />

63 9810.0156 – Rev.04 –12/01/2007<br />

Danger! First start-up must be done by only<br />

authorized service. Before all these applications, expert or<br />

installer of heating system installing and controlling the<br />

installation must check the imperviousness of line, and<br />

declerates the sufficiency of installation to authorized<br />

service. Authorized service checks all parameters that is<br />

necessary for working of the boiler and all substances<br />

mentioned at the top, measures burning values of the<br />

boiler and operates the boiler.<br />

At the unsuitable appications, there is danger risk to<br />

damage to people, envoirement and objects! Devices<br />

which is not started up by authorized services will be out of<br />

warranty and manufacturer company is not responsible for<br />

possible damages.<br />

Attention! It is not allowed heating boiler to be<br />

worked in cicumstances such as building works having<br />

intense dust. Devices may break down.<br />

Injury danger due to hot water! Boiling water may<br />

release from relief valve or drain line for short time when<br />

device is started up.<br />

- Switch on raidator switch.<br />

- Switch on Fuel oil/gas locking mechanism.<br />

- Switch on the switch of boiler line and operating<br />

switch where is on control panel of boiler.<br />

- Arrange essential settings on setup-operating unit<br />

for desired temperature of ambient turning the button.<br />

40 www.baymak.com.tr

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!