06.08.2013 Views

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Installation<br />

63 9810.0156 – Rev.04 –12/01/2007<br />

If there is leakage on front cover of the boiler,<br />

tighten the bolt hinge nuts on the cover to overcome.<br />

Do not smoke and light a fire in boiler room. Comply<br />

with operation instructions related with boiler room.<br />

We recommend that make a maintenance<br />

contract with authorized service for providing<br />

regular and proper operation.<br />

Make chimney mounting rightly according to related<br />

standards.Use tape coated aluminium folio or smiliar non<br />

flammable band for providing imperviousness on chimney.<br />

Connect filling and discharging line of expansion<br />

tank. There must not be a valfe on connection pipe<br />

between boiler expansion tank and closed expansion tank.<br />

Otherwise boiler will be out of warranty.<br />

Pull and push explosion cover<br />

on back surface of boiler a few times<br />

by using your hand to check working<br />

situation. Explosion cover was<br />

controlled in factory before<br />

transportation. Explosion cover<br />

regulates operation of boiler when<br />

burner works at first time by opening<br />

towards out. Repeat the operation<br />

control before burner works. See<br />

mounting section for detailed<br />

information for explosion cover<br />

mounting.<br />

20 www.baymak.com.tr

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!