AFFECTED ENVIRONMENT & ENVIRONMENTAL CONSEQUENCES CHAPTER 3<br />

Table 3-28 summarizes current (Alternative 1), post-harvest, and post-rehabilitation detrimental soil<br />

conditions within proposed vegetation treatment units under both Alternatives 2 and 3. It does not<br />

include any detrimental soil impacts associated with fuel reduction activities outside of vegetation units or<br />

reforestation activities as described previously. These activities would be accomplished without utilizing<br />

mechanized harvest equipment, or in the case of fuel reduction units, would utilize equipment with<br />

relatively low ground pressures and require two (2) or fewer passes to accomplish the work. It does<br />

include roads, water sets, or other existing detrimentally impacted soils if those sites are included within<br />

the treatment (activity) unit boundary. Unit by unit soil conditions are described in the Tables B-1<br />

(Alternative 2) and B-2 (Alternative 3) in Appendix B. The following discussion provides further<br />

summary discussion of the impacts of harvest activity in proposed harvest units.<br />

Table 3-28 Projected Levels of Detrimental Soil Impacts by Alternative Following Timber Harvest Activity and<br />

Subsoiling<br />

Levels of<br />

Detrimental Soil<br />

Conditions<br />

Existing Condition<br />

(Alternative 1)<br />

Following Harvest<br />

Post-Project Condition<br />

Following Subsoiling<br />

Mitigation<br />

Alternative 2 Alternative 3<br />

Detrimental Soil Conditions Detrimental Soil Conditions<br />

20% Total 20% Total<br />

66 units<br />

142 Ac.<br />

61 units<br />

834 Ac.<br />

67 units<br />

867 Ac.<br />

4 units<br />

77 Ac.<br />

9 units<br />

157 Ac.<br />

3 units<br />

66 Ac.<br />

3-97<br />

70 units<br />

219 Ac.<br />

70 units<br />

991 Ac.<br />

70 units<br />

933 Ac.<br />

75 units<br />

221 Ac.<br />

64 units<br />

883 Ac.<br />

72 units<br />

1,101 Ac.<br />

1 unit<br />

58 Ac.<br />

9 units<br />

218 Ac.<br />

1 units<br />

53 Ac.<br />

73units<br />

279 Ac.<br />

73 units<br />

1,101 Ac.<br />

73 units<br />

1,154 Ac.<br />

The analysis indicates that, to provide access to harvest units and facilitate ground-based logging<br />

activities, Alternative 3 would result in 121 acres more soil disturbance following subsoiling mitigation<br />

than would Alternative 2.<br />

Alternative 2 proposes harvest activities on approximately 6,480 acres. Of this total, ground-based<br />

equipment would be used in 70 harvest units totaling 6,451 acres. Approximately 29 acres in two units<br />

(units P1, P2) would be treated without the use of ground-based equipment.<br />

Within the 70 units proposed for harvest using ground-based equipment, there are an estimated 219 acres,<br />

or approximately 3.4 percent of the proposed treatment acres, of detrimentally disturbed soil within 58 of<br />

those 70 units. This includes logging facilities from past timber management activities in addition to sites<br />

associated with other management facilities (water sets, OHV trails, etc.). This includes four (4)<br />

proposed units, H07, H38, H41, and P04, which have pre-harvest detrimental soil conditions in excess of<br />

20 percent of the unit area (Appendix B, Table B-1). Following harvest activities, the acreage of<br />

detrimentally impacted soils would increase to approximately 991 acres, an increase of 772 acres, or<br />

approximately 15.4 percent of the harvest acres. Detrimental soil conditions would remain at or below<br />

the LRMP standard within 61 of the harvest units. Detrimental soil impacts would exceed 20 percent of<br />

the unit area in the remaining nine (9) units (H02, H07, H19, H36, H38, H40, H41, P04, and P19).<br />

Portions of 12 units would receive subsoiling treatments to rehabilitate 58 acres of detrimentally<br />

compacted soil associated with roads, log landings and main skid trails. This would include the nine units<br />

that are expected to exceed the LRMP standard plus three (3) additional activity areas (H10, H23, and<br />

H28) where short segments of existing road would be decommissioned following project activities. The<br />

analysis predicts that five (5) of the 12 units in which subsoiling would be applied would see a decrease in<br />

the area associated with detrimental soil impacts (H07, H19, H38, H41, and P04). The remaining seven