13.08.2013 Views

Environmental Assessment

Environmental Assessment

Environmental Assessment

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ALTERNATIVE DESCRIPTION – ALTERNATIVE –TREATMENTS CHAPTER 2<br />

Roads<br />

Roads 2312-466, 2312-467, and 2312-468, totaling approximately 1.1 miles, were proposed for closure<br />

when the project was originally scoped. Further analysis determined that these roads had been previously<br />

closed. They are not included in the analysis or decision.<br />

A roads analysis was conducted to determine if any roads in the planning area were surplus to current or<br />

future management needs and could be closed or decommissioned and removed from the transportation<br />

system. Road closures and decommissioning would be used to mitigate the effects of vegetation and fuel<br />

reduction treatments on wildlife habitat, particularly to reduce the effects of reductions in hiding and<br />

thermal cover and to reduce habitat fragmentation. Approximately 19 miles of forest system roads would<br />

be closed or decommissioned. This includes the closure of approximately 3.0 miles and the<br />

decommissioning of approximately 16.0 miles of roads. All are located within the deer winter range<br />

(MA-7) and scenic views (MA-9) land allocations of the LRMP.<br />

Unless otherwise noted, for the purposes of this project, a road recommended for decommissioning is<br />

removed from the transportation system.<br />

Table 2-1 lists the roads proposed for closure and decommissioning as a result of that analysis. The table<br />

also includes the miles of road proposed for closure. Mileage figures are based on the district roads<br />

database. Figures 1-6a through 1-6c displays the specific roads or road segments proposed for closure.<br />

2-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!