03.04.2014 Views

Digital Train Radio System Kingsgrove BTS Site Review of ...

Digital Train Radio System Kingsgrove BTS Site Review of ...

Digital Train Radio System Kingsgrove BTS Site Review of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2 Statutory Position and Requirements<br />

The description <strong>of</strong> the proposed works and the associated environmental impacts has been<br />

undertaken in the context <strong>of</strong> Clause 228 <strong>of</strong> the Environmental Planning and Assessment<br />

Regulation 2000, the Threatened Species Conservation Act 1995 (TSC Act), and the<br />

(Commonwealth) Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).<br />

In doing so, this REF helps fulfil the requirements <strong>of</strong> Section 111 <strong>of</strong> the Environmental Planning<br />

and Assessment Act 1979 (EP&A Act), that RailCorp must examine and take into account, to<br />

the fullest extent possible, all matters affecting or likely to affect the environment by reason <strong>of</strong><br />

the activity. The legislative framework relevant to the proposed works and associated approvals<br />

is set out in the following sections.<br />

2.1 Environmental Planning and Assessment Act 1979<br />

The proposal comprises an ‗activity‘ for the purposes <strong>of</strong> Part 5 <strong>of</strong> the Environmental Planning<br />

and Assessment Act 1979 (the EP&A Act). As the determining authority for the purposes <strong>of</strong> Part<br />

5 <strong>of</strong> the EP&A Act, RailCorp must examine and take into account to the fullest extent possible<br />

all matters affecting or likely to affect the environment by reason <strong>of</strong> that activity, in accordance<br />

with section 111 <strong>of</strong> the EP&A Act.<br />

To document RailCorp‘s considerations under Part 5 <strong>of</strong> the EP&A Act, RailCorp is required to<br />

prepare a <strong>Review</strong> <strong>of</strong> Environmental Factors Report (REF), which includes mitigation measures<br />

to manage and minimise impacts on the environment. The REF document will be exhibited and<br />

made publicly available. During the exhibition period, the community are encouraged to make<br />

submissions to RailCorp on the proposal and any potential environmental impacts.<br />

Prior to determining whether or not to proceed with the project, RailCorp will consider issues<br />

raised in submissions and respond to community feedback. RailCorp may propose changes to<br />

the proposal and detail these in the determination report. These reports would be made<br />

available to the public on the RailCorp website (www.railcorp.info).<br />

Should RailCorp determine to proceed, the proposal would be constructed and operated in<br />

accordance with the mitigation measures proposed in the REF, determination report and any<br />

conditions <strong>of</strong> approval.<br />

Page 13 <strong>of</strong> 78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!