Digital Train Radio System Kingsgrove BTS Site Review of ...
Digital Train Radio System Kingsgrove BTS Site Review of ...
Digital Train Radio System Kingsgrove BTS Site Review of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5 References<br />
• DECC (2009) Interim Construction Noise Guideline. Prepared by the Department <strong>of</strong><br />
Environment and Climate Change, Sydney.<br />
• DECCW (2009) Waste Classification Guidelines. Prepared by the Department <strong>of</strong><br />
Environment, Climate Change and Water, Sydney.<br />
• DEWHA (2010) Reducing Greenhouse Gas Emissions. Accessed on 9 June 2011 at:<br />
http://www.environment.gov.au/settlements/transport/fuelguide/environment.html<br />
• DIPNR (2004) Guideline for the Preparation <strong>of</strong> Environmental Management Plans.<br />
Prepared by the Department <strong>of</strong> Infrastructure, Planning and Natural Resources, Sydney.<br />
• DoP (2010) NSW Telecommunication Facilities Guideline including Broadband. Prepared<br />
by Department <strong>of</strong> Planning, Sydney.<br />
• Landcom (2004) Managing Urban Stormwater, Soils and Construction Guidelines (the Blue<br />
Book). Prepared by Landcom/Department <strong>of</strong> Housing, Sydney.<br />
• RTA (2005) AADT volumes for Sydney Region 2005. Accessed on 1 June 2011 at:<br />
http://www.rta.nsw.gov.au/trafficinformation/downloads/aadtdata_dl1.html<br />
• Rockdale City Council (2010) Supplementary State <strong>of</strong> the Environment Report 2009/2010.<br />
Prepared by Rockdale City Council, Sydney.<br />
• RailCorp (2009): Contaminated Land Management Procedure (EMS-09-PR-0004).<br />
Page 68 <strong>of</strong> 78