Control Measures<br />

Impacts associated with traffic and access will be minimised through a range <strong>of</strong> control<br />

measures, which will include, but will not be limited to those outlined below.<br />

<br />

<br />

<br />

<br />

<br />

A Traffic Management Plan will be developed for the site.<br />

The site will be fenced <strong>of</strong>f to avoid public access.<br />

A dilapidation survey will be completed before demobilisation.<br />

Any pavement or road surfaces damaged during construction will be restored when work is<br />

finished.<br />

The Traffic Management Plan will ensure compliance with Australian Standard AS1742.3-<br />

2002 Manual <strong>of</strong> uniform traffic control devices – traffic control devices on roads.<br />

4.15 Utilities and Services<br />

Existing Situation<br />

There are a number <strong>of</strong> existing services, such as electricity, fibre and sewer close to the<br />

proposed site.<br />

Potential Impacts<br />

The facility will be connected to the existing RailCorp electricity supply located approximately<br />

150 metres away from the proposed site. The facility will not require connections to water or<br />

gas. RailCorp will continue to use their existing power supply.<br />

A number <strong>of</strong> public utilities are close to the site and there is potential for some known or<br />

unknown services to be impacted during excavation or relocation/connections. Depending on<br />

the service, outages or interruptions could affect nearby properties or the rail network.<br />

No overhead wires will need to be relocated.<br />

Control Measures<br />

<br />

<br />

Ensure that a Dial Before You Dig call and RailCorp services search are undertaken to<br />

identify services.<br />

Public utility providers will be consulted to minimise impacts during any utility relocations or<br />

readjustments.<br />

4.16 Light Spill<br />

Light spill impacts will not occur as night works are not proposed. In addition, there is no new<br />

permanent lighting proposed. No further consideration <strong>of</strong> light spill is considered necessary.<br />