3.1.4 Fibre optics<br />

The proposal is to install a new RailCorp Network Access Point (NAP) in the existing pit at<br />

TE12+541 and run two new 12 core single mode optical fibres (SMOF) to this location. The two<br />

new 12 core SMOF will run in a new trench for approximately 50 metres towards to existing pit<br />

at TE12+485. The pair <strong>of</strong> fibres will continue the existing pit pipe route towards existing pit at<br />

TE12+541 where a new joint is also installed. At the new NAP, it will be spliced with the<br />

RailCorp bearer network. Approximately 2 x 110 metres <strong>of</strong> 12 cores SMOF will be required.<br />

3.1.5 Earthing<br />

The earthing installation will comprise six earth stakes at a pre-determined distance apart. The<br />

grid will be nominally 4.0 metres x 2.0 metres, placing the six earth stakes two metres apart.<br />

Once these earth stakes have been installed, the system will be tested and modified if needed.<br />

The initial extent <strong>of</strong> the trenching for earthing grid will be around 20 metres. However, it can be<br />

extended up to five metres if the results show that the earthing arrangement is insufficient.<br />

3.2 Construction Methodology<br />

Construction <strong>of</strong> the <strong>BTS</strong> facility will require the use <strong>of</strong> approximately 60 square metres <strong>of</strong> land.<br />

This area will allow for the erection <strong>of</strong> the monopole and the slab containing the <strong>BTS</strong> and power<br />

cabinets.<br />

The area <strong>of</strong> ground disturbance at the <strong>BTS</strong> site is likely to be in the vicinity <strong>of</strong> five square<br />

metres. The monopole foundation will require an excavation approximately five metres deep<br />

with a diameter <strong>of</strong> one metre. This will result in approximately five cubic metres <strong>of</strong> excavated<br />

material which may include rock.<br />

Installation <strong>of</strong> the power and fibre optic cables will require excavation <strong>of</strong> trenches approximately<br />

1000 millimetres maximum depth and 500 millimetres wide.<br />

The indicative construction methodology <strong>of</strong> the facility will include elements outlined below.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Non-destructive excavation before construction to establish underground installations.<br />

<strong>Site</strong> establishment.<br />

Excavation <strong>of</strong> the foundation for the monopole using excavator, drills or auger.<br />

Delivery and pouring <strong>of</strong> concrete on site for the monopole foundation.<br />

Installation <strong>of</strong> concrete slab brought to site for <strong>BTS</strong> and power cabinets.<br />

Excavation <strong>of</strong> trenches for power and fibre optic cables.<br />

Installation <strong>of</strong> conduit within trenches, followed by installation <strong>of</strong> cables within conduits.<br />

Backfilling <strong>of</strong> trenches.<br />

Transport and installation <strong>of</strong> monopole sections using trucks and riggers.<br />