03.04.2014 Views

Digital Train Radio System Kingsgrove BTS Site Review of ...

Digital Train Radio System Kingsgrove BTS Site Review of ...

Digital Train Radio System Kingsgrove BTS Site Review of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• It does not support a functional addressing system that maps train run numbers to mobile<br />

subscribers‘ numbers, which is a key requirement.<br />

• It does not meet the interoperability requirements.<br />

• It relies on a dispatch terminal for functionality, which does not meet RailCorp‘s reliability<br />

requirements.<br />

• It is not scalable in regards to the future growth <strong>of</strong> the rail network.<br />

TETRA is also a proven emergency services communications system and is deployed in a<br />

number metropolitan rail networks. However, it was rejected for the reasons listed below.<br />

• This application is confined primarily to underground metro networks that are not<br />

comparable to RailCorp‘s network.<br />

• It relies on a dispatch terminal for functionality, which does not meet the RailCorp reliability<br />

requirements.<br />

• It does not meet the interoperability requirements.<br />

• There is no commercialised Automatic <strong>Train</strong> Protection (ATP) solution available.<br />

GSM-R was deemed the platform most suitable for RailCorp‘s train network and system<br />

requirements for the reasons listed below.<br />

• It is the only rail-specific communications standard and has the highest levels <strong>of</strong> safety and<br />

reliability in its design.<br />

• It is an open standard with a large number <strong>of</strong> equipment suppliers.<br />

• It achieved a higher level <strong>of</strong> compliance with the RailCorp functional requirements when<br />

compared to the other systems.<br />

• It is deployed by major rail operators in Europe and Asia, some with networks comparable<br />

in size and complexity to RailCorp‘s network.<br />

• It operates on a spectrum <strong>of</strong> 1800 MHz which was available for purchase by RailCorp. The<br />

other options would have required the leasing <strong>of</strong> a radio spectrum from a<br />

telecommunications licence holder.<br />

• It is a scalable network that can grow in step with RailCorp operations and network.<br />

• It is compatible with the Australian Rail Track Corporation‘s communication system.<br />

• It provides a platform for future enhancements and increased operational safety, including<br />

a Level 2 Automatic <strong>Train</strong> Protection (ATP) <strong>System</strong>, as per the recommendations <strong>of</strong> the<br />

Waterfall inquiry.<br />

• It will deliver the best value for money solution with the least risk.<br />

Page 28 <strong>of</strong> 78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!