Cable stripping tools<br />

Hydraulic hole punch (sized to suit cable gland)<br />

Crimpers ratchet type<br />

Battery drill<br />

Multimeter<br />

Electrical hand tools<br />

Hand digging tools (shovels etc.)<br />

The skip bin and site compound area will be within the RailCorp land near the site. The<br />

construction process will require an average <strong>of</strong> four to six vehicle movements and a team <strong>of</strong><br />

three to six people on site per day.<br />

3.3 Timing and Costing<br />

Construction is planned to begin in the first half <strong>of</strong> 2013 and construction activities will require<br />

four to six weeks. The bulk <strong>of</strong> work may require to be undertaken in non-consecutive work days.<br />

Proposed construction timing:<br />

Standard working hours<br />

Monday to Friday 7.00am to 6.00pm<br />

Saturday 8:00am to 1:00pm<br />

Evening/weekends/out <strong>of</strong> hours:<br />

No night work or out <strong>of</strong> hours work is proposed.<br />

No work on Sundays/public holidays.<br />

The DTRS project has an overarching value <strong>of</strong> $225 million. This includes the design, supply,<br />

and installation <strong>of</strong> the DTRS on the RailCorp electrified network plus a five-year life support<br />

component.<br />