Clause 228 Factor Impacts Comments<br />

(l) Any pollution <strong>of</strong> the<br />

environment?<br />

(m) Any environmental<br />

problems associated with<br />

the disposal <strong>of</strong> waste?<br />

(n) Any increased demands on<br />

resources, natural or<br />

otherwise which are, or are<br />

likely to become in short<br />

supply?<br />

(o) Any cumulative<br />

environmental effect with<br />

other existing or likely<br />

future activities?<br />

(p) Any impact on coastal<br />

processes and coastal<br />

hazards, including those<br />

under projected climate<br />

change conditions?<br />

-ve short-term<br />

-ve short term<br />

nil<br />

-ve short-term<br />

+ve long-term<br />

nil<br />

During construction there is a risk <strong>of</strong><br />

noise, water and air pollution. These risks<br />

will be minimised through the<br />

implementation <strong>of</strong> the proposed control<br />

measures.<br />

During construction, it is possible that<br />

spoil may be contaminated and an<br />

appropriate remediation plan and/or<br />

waste disposal method will be required.<br />

Construction materials are readily<br />

available and will be sourced from local<br />

contractors where possible.<br />

The project may have a short term<br />

cumulative impact on noise and traffic<br />

conditions if scheduled to coincide with<br />

construction <strong>of</strong> the <strong>Kingsgrove</strong> to<br />

Revesby Quadruplication.<br />

Overall this proposal, as part <strong>of</strong> the DTRS<br />

Project, will have significant benefits in<br />

providing a more effective<br />

communications systems for the RailCorp<br />

network. Once active, the new DTRS will<br />

provide a safer and more efficient rail<br />

network.<br />

The proposed works are not located on<br />

the coastline and have not been identified<br />

as within an area that will be subject to<br />

increased sea level rise.<br />

Key: -ve = Negative Impact, Nil = No Impact, +ve = Positive Impact<br />

EPBC Act 1999 Factors<br />

Matters <strong>of</strong> national environmental significance must also be considered as a requirement <strong>of</strong> the<br />

EPBC Act. Table 4 provides a summary <strong>of</strong> how these factors have been considered.<br />

Page 58 <strong>of</strong> 78