03.04.2014 Views

Digital Train Radio System Kingsgrove BTS Site Review of ...

Digital Train Radio System Kingsgrove BTS Site Review of ...

Digital Train Radio System Kingsgrove BTS Site Review of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Air Quality<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Plant and equipment will be maintained in accordance with manufacturers‘<br />

specifications.<br />

Regular inspection <strong>of</strong> plant and equipment will be undertaken to ascertain that fitted<br />

emission controls are operating efficiently.<br />

Plant or machinery will not be left idling.<br />

Stockpiles will be maintained and contained appropriately, which could include<br />

covering or regular watering to minimise dust.<br />

Minimal work will be undertaken during high wind periods.<br />

Trucks and train carriages transporting spoil and other waste materials from site will be<br />

covered appropriately.<br />

Disturbed areas will be rehabilitated after construction.<br />

Biodiversity<br />

<br />

<br />

<br />

<br />

<br />

No native vegetation will be removed.<br />

Root cutting will be avoided.<br />

Care will be taken to minimise the spread <strong>of</strong> weeds.<br />

The work site will be inspected for any trapped or injured fauna at the start <strong>of</strong> each<br />

day.<br />

Trenches/excavations will be covered at the end <strong>of</strong> each day and inspected before<br />

they are backfilled to ensure that no fauna species are harmed.<br />

Noise and Vibration<br />

<br />

Please refer to Table 2 Construction Noise Control Measures.<br />

Page 62 <strong>of</strong> 78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!