Water Sensitive Urban Design<br />

$18,000<br />

$16,000<br />

$14,000<br />

$12,000<br />

Bioretention basin sized to remove 45 percent of TN pollutant<br />

loads generated from a 1 hectare, 100 percent impervious<br />

catchment (road)<br />

Annualised cost of system in terms of pollutant load reductions<br />

are:<br />

/ $70 per kg TN removed<br />

/ $320 per kg TP removed<br />

/ $1 per kg TSS removed<br />

Cost ($)<br />

$10,000<br />

$8,000<br />

Decomissioning Cost<br />

Renewal Cost<br />

<strong>Maintenance</strong> Cost<br />

Capital Cost<br />

$6,000<br />

$4,000<br />

$2,000<br />

$-<br />

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49<br />

Time (years)<br />

Figure 1: LCC for bioretention basins<br />

$140,000.00<br />

$120,000.00<br />

$100,000.00<br />

Constructed wetland sized to remove 45 percent of TN pollutant<br />

loads generated from a 1 hectare, 100 percent impervious<br />

catchment (road)<br />

Annualised cost of system in terms of pollutant load reductions<br />

are:<br />

/ $440 per kg TN removed<br />

/ $2300 per kg TP removed<br />

/ $3 per kg TSS removed<br />

Cost ($)<br />

$80,000.00<br />

$60,000.00<br />

Decomissioning Cost<br />

Renewal Cost<br />

<strong>Maintenance</strong> Cost<br />

Capital Cost<br />

$40,000.00<br />

$20,000.00<br />

$-<br />

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49<br />

Time (years)<br />

Figure 2: LCC for constructed wetlands<br />

16 <strong>Book</strong> 4 | MAINTENANCE