Water Sensitive Urban Design<br />
$18,000<br />
$16,000<br />
$14,000<br />
$12,000<br />
Bioretention basin sized to remove 45 percent of TN pollutant<br />
loads generated from a 1 hectare, 100 percent impervious<br />
catchment (road)<br />
Annualised cost of system in terms of pollutant load reductions<br />
are:<br />
/ $70 per kg TN removed<br />
/ $320 per kg TP removed<br />
/ $1 per kg TSS removed<br />
Cost ($)<br />
$10,000<br />
$8,000<br />
Decomissioning Cost<br />
Renewal Cost<br />
<strong>Maintenance</strong> Cost<br />
Capital Cost<br />
$6,000<br />
$4,000<br />
$2,000<br />
$-<br />
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49<br />
Time (years)<br />
Figure 1: LCC for bioretention basins<br />
$140,000.00<br />
$120,000.00<br />
$100,000.00<br />
Constructed wetland sized to remove 45 percent of TN pollutant<br />
loads generated from a 1 hectare, 100 percent impervious<br />
catchment (road)<br />
Annualised cost of system in terms of pollutant load reductions<br />
are:<br />
/ $440 per kg TN removed<br />
/ $2300 per kg TP removed<br />
/ $3 per kg TSS removed<br />
Cost ($)<br />
$80,000.00<br />
$60,000.00<br />
Decomissioning Cost<br />
Renewal Cost<br />
<strong>Maintenance</strong> Cost<br />
Capital Cost<br />
$40,000.00<br />
$20,000.00<br />
$-<br />
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49<br />
Time (years)<br />
Figure 2: LCC for constructed wetlands<br />
16 <strong>Book</strong> 4 | MAINTENANCE