27.04.2014 Views

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Water Sensitive Urban Design<br />

Form D – Landscape Planting<br />

Purpose:<br />

To ensure correct plants are supplied and installed.<br />

Checklist:<br />

Item<br />

Checked<br />

Satisfactory<br />

Action/s<br />

(if required)<br />

Actions<br />

addressed<br />

(initial)<br />

Macrophyte zone landscape installation<br />

Supplied plants are correct species<br />

Changes to species planted must be approved by<br />

wetland designer/ecologist and marked up on<br />

as-constructed drawings<br />

Supplied plants are in correct pot sizes, maturity<br />

(minimum 300 mm in height) and hardened<br />

Plants have been installed at correct planting density<br />

Water level control is operating appropriately<br />

Correct mulch has been supplied and installed to<br />

batters and bunds above the extended detention<br />

and secured in place<br />

As constructed drawings marked up with final<br />

plant species and densities<br />

HOLD POINT - Sign off is required from superintendent and wetland designer before proceeding<br />

Macrophyte zone landscape establishment<br />

Weeds removed as required<br />

<strong>Book</strong> 4 | MAINTENANCE 65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!