27.04.2014 Views

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Water Sensitive Urban Design<br />

Form B – Sediment and Erosion Control<br />

Purpose:<br />

To ensure sediment and erosion control measures are correctly installed to protect the macrophyte zone of<br />

the constructed wetland.<br />

Checklist:<br />

Items<br />

Checked<br />

Satisfactory<br />

Action/s<br />

(if required)<br />

Actions<br />

addressed<br />

(initial)<br />

Continuous silt fences installed around all elements<br />

of constructed wetlands<br />

If silt fences are deemed inadequate, other sediment<br />

and erosion control measures installed to ensure<br />

sediment does not enter basin<br />

High flow bypass channel protective measures in<br />

place (that is, turf installed and where required<br />

reinforced turf)<br />

Inlet zone disconnected from macrophyte zone (that<br />

is, plates placed on overflow pit and secured)<br />

If inlet zone not disconnected, macrophyte zone<br />

converted into a sedimentation basin (base and<br />

batters of macrophyte<br />

Hold Point - Sign off is required from superintendent and wetland designer before proceeding<br />

Comments<br />

Signed by Superintendent(s):<br />

Print Name:<br />

Date:<br />

<strong>Book</strong> 4 | MAINTENANCE 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!