Landcom Book 4 Maintenance - WSUD
Landcom Book 4 Maintenance - WSUD
Landcom Book 4 Maintenance - WSUD
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Water Sensitive Urban Design<br />
Form B – Sediment and Erosion Control<br />
Purpose:<br />
To ensure sediment and erosion control measures are correctly installed to protect the macrophyte zone of<br />
the constructed wetland.<br />
Checklist:<br />
Items<br />
Checked<br />
Satisfactory<br />
Action/s<br />
(if required)<br />
Actions<br />
addressed<br />
(initial)<br />
Continuous silt fences installed around all elements<br />
of constructed wetlands<br />
If silt fences are deemed inadequate, other sediment<br />
and erosion control measures installed to ensure<br />
sediment does not enter basin<br />
High flow bypass channel protective measures in<br />
place (that is, turf installed and where required<br />
reinforced turf)<br />
Inlet zone disconnected from macrophyte zone (that<br />
is, plates placed on overflow pit and secured)<br />
If inlet zone not disconnected, macrophyte zone<br />
converted into a sedimentation basin (base and<br />
batters of macrophyte<br />
Hold Point - Sign off is required from superintendent and wetland designer before proceeding<br />
Comments<br />
Signed by Superintendent(s):<br />
Print Name:<br />
Date:<br />
<strong>Book</strong> 4 | MAINTENANCE 63