Water Sensitive Urban Design<br />
Geotechnical engineer certification of in-situ<br />
compaction or liner placement<br />
Geotechnical engineer certification / sign off<br />
of key bunds<br />
Hold Point - Sign off is required from superintendent and wetland designer before proceeding<br />
Functional and hydraulic functions<br />
Inlet and outlet pipes and headwalls<br />
correctly set out and at correct level<br />
(upstream and downstream ends)<br />
Inlet zone connection pit or pipe<br />
correct size, location and level<br />
Outlet riser connection, location,<br />
size and levels correct<br />
Bypass weir correct width and level<br />
Overflow pit is correct size and crest<br />
is at correct level<br />
<strong>Maintenance</strong> pipe and valve installed<br />
at correct location and level<br />
<strong>Maintenance</strong> access installed to inlet zone<br />
Rock or concrete base constructed to inlet zone<br />