Water Sensitive Urban Design<br />

Geotechnical engineer certification of in-situ<br />

compaction or liner placement<br />

Geotechnical engineer certification / sign off<br />

of key bunds<br />

Hold Point - Sign off is required from superintendent and wetland designer before proceeding<br />

Functional and hydraulic functions<br />

Inlet and outlet pipes and headwalls<br />

correctly set out and at correct level<br />

(upstream and downstream ends)<br />

Inlet zone connection pit or pipe<br />

correct size, location and level<br />

Outlet riser connection, location,<br />

size and levels correct<br />

Bypass weir correct width and level<br />

Overflow pit is correct size and crest<br />

is at correct level<br />

<strong>Maintenance</strong> pipe and valve installed<br />

at correct location and level<br />

<strong>Maintenance</strong> access installed to inlet zone<br />

Rock or concrete base constructed to inlet zone<br />

<strong>Book</strong> 4 | MAINTENANCE 61