Landcom Book 4 Maintenance - WSUD
Landcom Book 4 Maintenance - WSUD
Landcom Book 4 Maintenance - WSUD
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Water Sensitive Urban Design<br />
Form C – Topsoil and Finished Levels<br />
Purpose:<br />
To ensure the topsoil is installed to the correct depth and finished levels of wetland are correct and meet the<br />
design.<br />
Checklist:<br />
Item<br />
Checked<br />
Satisfactory<br />
Action/s<br />
(if required)<br />
Actions<br />
addressed<br />
(initial)<br />
Sedimentation basin desilted prior to plant establishment<br />
Topsoil meets the requirements of AS4419 and laboratory<br />
tests provided<br />
Topsoil has been screened and is free of large debris<br />
Topsoil applied to base (minimum 300 mm depth)<br />
Final topsoil levels are consistent with design levels<br />
Surface is smooth and free of local depressions and debris<br />
Hold Point - Sign off is required from superintendent and basin/pond designer before proceeding<br />
Comments<br />
Signed by Superintendent(s):<br />
Print Name:<br />
Date:<br />
<strong>Book</strong> 4 | MAINTENANCE 73