27.04.2014 Views

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Water Sensitive Urban Design<br />

Form C – Topsoil and Finished Levels<br />

Purpose:<br />

To ensure the topsoil is installed to the correct depth and finished levels of wetland are correct and meet the<br />

design.<br />

Checklist:<br />

Item<br />

Checked<br />

Satisfactory<br />

Action/s<br />

(if required)<br />

Actions<br />

addressed<br />

(initial)<br />

Sedimentation basin desilted prior to plant establishment<br />

Topsoil meets the requirements of AS4419 and laboratory<br />

tests provided<br />

Topsoil has been screened and is free of large debris<br />

Topsoil applied to base (minimum 300 mm depth)<br />

Final topsoil levels are consistent with design levels<br />

Surface is smooth and free of local depressions and debris<br />

Hold Point - Sign off is required from superintendent and basin/pond designer before proceeding<br />

Comments<br />

Signed by Superintendent(s):<br />

Print Name:<br />

Date:<br />

<strong>Book</strong> 4 | MAINTENANCE 73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!