27.04.2014 Views

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Water Sensitive Urban Design<br />

All junctions and connections have<br />

been appropriately sealed using sealant<br />

Underdrain pipes correctly connected and<br />

sealed into overflow pit<br />

Top of clean out points at design level (i.e.<br />

approximately 100mm above filter media surface<br />

level)<br />

Extension of under-drains out of the<br />

basin are NOT perforated<br />

Clean out points capped<br />

Hold Point - Sign off is required from superintendent and bioretention basin designer before proceeding<br />

Comments:<br />

Signed by Superintendent(s):<br />

Print Name:<br />

Date:<br />

<strong>Book</strong> 4 | MAINTENANCE 53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!