27.04.2014 Views

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Water Sensitive Urban Design<br />

Form D – Landscape Planting (inlet zone)<br />

Purpose:<br />

To ensure correct plants are supplied and installed.<br />

Checklist:<br />

Item<br />

Checked<br />

Satisfactory<br />

Action/s<br />

(if required)<br />

Actions<br />

addressed<br />

(initial)<br />

Inlet zone landscape installation<br />

Supplied plants are correct species<br />

Changes to species planted must be approved by wetland<br />

designer/ecologist and marked up on as-constructed<br />

drawings<br />

Supplied plants are in correct pot sizes, maturity (minimum<br />

300 mm in height) and hardened<br />

Plants have been installed at correct planting density<br />

Correct mulch has been supplied and installed to batters<br />

and bunds above the normal water level and secured in<br />

place<br />

As constructed drawings marked up with final plant species<br />

and densities<br />

HOLD POINT - Sign off is required from superintendent and wetland designer before proceeding<br />

Inlet zone landscape establishment<br />

Weeds removed as required<br />

Watering occurring as required<br />

Inlet zone plantings established such that the water level in<br />

the macrophyte zone can be allowed to reach design level<br />

(typically 500 mm above the normal water level)<br />

HOLD POINT - Sign off is required from superintendent and wetland designer before proceeding<br />

Comments<br />

Signed by Superintendent(s):<br />

Print Name:<br />

Date:<br />

<strong>Book</strong> 4 | MAINTENANCE 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!