Landcom Book 4 Maintenance - WSUD
Landcom Book 4 Maintenance - WSUD
Landcom Book 4 Maintenance - WSUD
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Water Sensitive Urban Design<br />
Form D – Landscape Planting (inlet zone)<br />
Purpose:<br />
To ensure correct plants are supplied and installed.<br />
Checklist:<br />
Item<br />
Checked<br />
Satisfactory<br />
Action/s<br />
(if required)<br />
Actions<br />
addressed<br />
(initial)<br />
Inlet zone landscape installation<br />
Supplied plants are correct species<br />
Changes to species planted must be approved by wetland<br />
designer/ecologist and marked up on as-constructed<br />
drawings<br />
Supplied plants are in correct pot sizes, maturity (minimum<br />
300 mm in height) and hardened<br />
Plants have been installed at correct planting density<br />
Correct mulch has been supplied and installed to batters<br />
and bunds above the normal water level and secured in<br />
place<br />
As constructed drawings marked up with final plant species<br />
and densities<br />
HOLD POINT - Sign off is required from superintendent and wetland designer before proceeding<br />
Inlet zone landscape establishment<br />
Weeds removed as required<br />
Watering occurring as required<br />
Inlet zone plantings established such that the water level in<br />
the macrophyte zone can be allowed to reach design level<br />
(typically 500 mm above the normal water level)<br />
HOLD POINT - Sign off is required from superintendent and wetland designer before proceeding<br />
Comments<br />
Signed by Superintendent(s):<br />
Print Name:<br />
Date:<br />
<strong>Book</strong> 4 | MAINTENANCE 67