Water Sensitive Urban Design<br />
Stage 1: Civil Construction<br />
Pre start construction meeting<br />
Subdivision<br />
Construction<br />
FORM A<br />
Earthworks and hydraulic /<br />
Functional Structures<br />
FORM C (bioretention basin)<br />
Filter media and finished levels<br />
Stage 2: Building phase protection<br />
FORM B<br />
Erosion and Sediment Control<br />
Allotment<br />
Building<br />
(up to 30 percent<br />
completion)<br />
Stage 3: Operational establishment<br />
FORM C<br />
(wetland and sedimentation)<br />
Top soil and finished levels<br />
FORM D<br />
Landscape Planting<br />
Allotment<br />
Building<br />
(greater than<br />
80 percent<br />
completion)<br />
Asset handover<br />
Asset handover checklist<br />
Completion<br />
of construction<br />
activities<br />
Figure 7: Staged construction of <strong>WSUD</strong> elements and the timing of relevant forms<br />