Water Sensitive Urban Design<br />

Stage 1: Civil Construction<br />

Pre start construction meeting<br />

Subdivision<br />

Construction<br />

FORM A<br />

Earthworks and hydraulic /<br />

Functional Structures<br />

FORM C (bioretention basin)<br />

Filter media and finished levels<br />

Stage 2: Building phase protection<br />

FORM B<br />

Erosion and Sediment Control<br />

Allotment<br />

Building<br />

(up to 30 percent<br />

completion)<br />

Stage 3: Operational establishment<br />

FORM C<br />

(wetland and sedimentation)<br />

Top soil and finished levels<br />

FORM D<br />

Landscape Planting<br />

Allotment<br />

Building<br />

(greater than<br />

80 percent<br />

completion)<br />

Asset handover<br />

Asset handover checklist<br />

Completion<br />

of construction<br />

activities<br />

Figure 7: Staged construction of <strong>WSUD</strong> elements and the timing of relevant forms<br />

<strong>Book</strong> 4 | MAINTENANCE 39